Integration of VR with BIM to facilitate real-time creation of bill of quantities during the design phase: A proof of concept study |
Jordan DAVIDSON1, John FOWLER1, Charalampos PANTAZIS1, Massimo SANNINO1, Jordan WALKER1, Moslem SHEIKHKHOSHKAR2, Farzad Pour RAHIMIAN2( ) |
1. Department of Architecture, University of Strathclyde, Glasgow G1 1XJ, UK 2. Department of Mechanical and Construction Engineering, Faculty of Engineering and Environment, Northumbria University, Newcastle NE1 8ST, UK |
|
|
Abstract As building practices change, procedures that seemed indispensable at one point can be abandoned for others, one example of which is the bill of quantities (B/Q). Research into the extant literature attributes the declining use of B/Qs to a multitude of reasons, such as its complexity, the potentially long time required to produce it, the growth in popularity of non-traditional procurement systems, and the challenge of using the information within the document in a construction schedule. With these issues in mind, building information modeling (BIM) and virtual reality (VR) are combined and proposed as a potential solution that allows inclusion of the client into the design process. Following a literature review and precedent study, an experiment was carried out using this new process to simulate a client’s design decisions on window and interior furnishings. The choices made by the client using VR automatically updated a B/Q schedule built in Revit and allowed them to have a firm understanding of project costs. Besides giving the client more confidence in a pleasing final outcome, the technology also ensured an up-to-date, accurate, and easily understandable B/Q. The proposed method features great potential savings in cost and time and gives the B/Q a newfound importance in future construction processes. The research case presented in this paper is a stepping stone in exploring new opportunities offered by VR and BIM and how they could improve the reliability and accuracy of traditional procurement within construction, specifically within the B/Q document.
|
Keywords
virtual reality
bill of quantities
BIM
Revit
real-time synchronisation
|
Corresponding Author(s):
Farzad Pour RAHIMIAN
|
Just Accepted Date: 05 May 2019
Online First Date: 18 June 2019
Issue Date: 06 August 2020
|
|
1 |
D Agency (2018). IKEA Virtual Reality Showroom. Demodern Digitalagentur
|
2 |
S Bandi, F Abdullah, R Amiruddin (2014). Recapitulating the issues concerning the applications of the bills of quantities. International Journal of Built Environment and Sustainability, 1(1): 63–70
https://doi.org/10.11113/ijbes.v1.n1.10
|
3 |
R Bille, S P Smith, K Maund, G Brewer (2014). Extending Building Information Models into Game Engines. New York: ACM Press
|
4 |
D Bouchlaghem, H Shang, J Whyte, A Ganah (2005). Visualisation in architecture, engineering and construction (AEC). Automation in Construction, 14(3): 287–295
https://doi.org/10.1016/j.autcon.2004.08.012
|
5 |
S E Chen (1995). Quicktime VR: An Image-based Approach to Virtual Environment Navigation. In: 22nd Annual Conference on Computer Graphics and Interactive Techniques, 29–38
|
6 |
C Corke (2017). Review: From Revit to VR. AEC Magazine, technology-mainmenu-35/1255
|
7 |
P R Davis, P E D Love, D Baccarini (2009). Bills of quantities: Nemesis or nirvana? Structural Survey, 27(2): 99–108
https://doi.org/10.1108/02630800910956434
|
8 |
C Donalek, S G Djorgovski, A Cioc, A Wang, J Zhang, E Lawler, S Yeh, A Mahabal, M Graham, A Drake, S Davidoff, J S Norris, G Longo (2014). Immersive and Collaborative Data Visualization Using Virtual Reality Platforms. 2014 IEEE International Conference on Big Data, 609–614
|
9 |
J Du, Z Zou, Y Shi, D Zhao (2018). Zero latency: Real-time synchronization of BIM data in virtual reality for collaborative decision-making. Automation in Construction, 85: 51–64
https://doi.org/10.1016/j.autcon.2017.10.009
|
10 |
JELD-WEN (2000). Interior and Exterior Doors, Windows, Patio Doors, Stairs. JELD-WEN
|
11 |
S Laryea (2011). Quality of tender documents: Case studies from the UK. Construction Management and Economics, 29(3): 275–286
https://doi.org/10.1080/01446193.2010.540019
|
12 |
H Li, P E D Love (1998). Visualization of Building Interior Design to Reduce Rework. IEEE Conference on Information Visualization, An International Conference on Computer Visualization and Graphics (Cat. No.98TB100246), 187–191
|
13 |
M Lorenz, M Spranger, T Riedel, F Pürzel, V Wittstock, P Klimant (2016). CAD to VR — A methodology for the automated conversion of kinematic CAD models to virtual reality. Procedia CIRP, 41: 358–363
https://doi.org/10.1016/j.procir.2015.12.115
|
14 |
M Martínez-Rojas, N Marín, M A V Miranda (2016). An intelligent system for the acquisition and management of information from bill of quantities in building projects. Expert Systems with Applications, 63: 284–294
https://doi.org/10.1016/j.eswa.2016.07.011
|
15 |
J I Messner, S C Yerrapathruni, A J Baratta, V E Whisker (2003). Using Virtual Reality to Improve Construction Engineering Education. American Society for Engineering Education Annual Conference & Exposition
|
16 |
A Nadeem, A K Wong, F K W Wong (2015). Bill of quantities with 3D views using building information modeling. Arabian Journal for Science and Engineering, 40(9): 2465–2477
https://doi.org/10.1007/s13369-015-1657-2
|
17 |
H Odeyinka, S Perera (2009). An evaluation of the budgetary reliability of bills of quantities in building procurement. COBRA 2009, Royal Institution of Chartered Surveyors (RICS), London, UK, 435–446
|
18 |
O A Olatunji (2011). Virtual reality and estimating practice: A software selection model for estimating. Practice, 11: 13
|
19 |
E A Petrova, M Rasmussen, R L Jensen, K Svidt (2017). Integrating Virtual Reality and BIM for End-user Involvement in Building Design: A Case Study. The Joint Conference on Computing in Construction (JC3), 699–706
|
20 |
F P Rahimian, V Chavdarova, S Oliver, F Chamo (2019). OpenBIM-Tango integrated virtual showroom for offsite manufactured production of self-build housing. Automation in Construction, 102: 1–16
https://doi.org/10.1016/j.autcon.2019.02.009
|
21 |
R A Rashid, M Mustapa, S N A Wahid (2006). Bills of Quantities — Are they still useful and relevant today? International Conference on Construction Industry
|
22 |
A Razali, A Tajudin, A Fadzli (2014). Applicability of bill of quantities in construction procurement. International Journal of Engineering Science Invention, 3(7): 31–34
|
23 |
Y Shi, J Du, S Lavy, D Zhao (2016). A multiuser shared virtual environment for facility management. Procedia Engineering, 145: 120–127
https://doi.org/10.1016/j.proeng.2016.04.029
|
24 |
D Sinclair (2013). RIBA Plan of Work 2013 Overview. Royal Institute of British Architects, London, UK
|
25 |
X Wang, M A Schnabel (2008). Mixed Reality in Architecture, Design, and Construction. Berlin: Springer
|
26 |
K Warwick, J O Gray, D Roberts (1993). Institution of Electrical, Virtual reality in engineering. Institution of Electrical Engineers, ISBN 0 85296 803 5
|
27 |
D Weidlich, L Cser, T Polzin, D Cristiano, H Zickner (2007). Virtual reality approaches for immersive design. CIRP Annals, 56(1): 139–142
https://doi.org/10.1016/j.cirp.2007.05.034
|
28 |
Zerolight L (2018). Zerolight. Available at Zerolight website on March 4, 2019
|
29 |
K Zima (2017). Impact of information included in the BIM on preparation of Bill of Quantities. Procedia Engineering, 208: 203–210
https://doi.org/10.1016/j.proeng.2017.11.039
|
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|