Integration of VR with BIM to facilitate real-time creation of bill of quantities during the design phase: A proof of concept study
Jordan DAVIDSON1, John FOWLER1, Charalampos PANTAZIS1, Massimo SANNINO1, Jordan WALKER1, Moslem SHEIKHKHOSHKAR2, Farzad Pour RAHIMIAN2()
1. Department of Architecture, University of Strathclyde, Glasgow G1 1XJ, UK
2. Department of Mechanical and Construction Engineering, Faculty of Engineering and Environment, Northumbria University, Newcastle NE1 8ST, UK
 Download: PDF(689 KB)   HTML
 Export: BibTeX | EndNote | Reference Manager | ProCite | RefWorks
Abstract

As building practices change, procedures that seemed indispensable at one point can be abandoned for others, one example of which is the bill of quantities (B/Q). Research into the extant literature attributes the declining use of B/Qs to a multitude of reasons, such as its complexity, the potentially long time required to produce it, the growth in popularity of non-traditional procurement systems, and the challenge of using the information within the document in a construction schedule. With these issues in mind, building information modeling (BIM) and virtual reality (VR) are combined and proposed as a potential solution that allows inclusion of the client into the design process. Following a literature review and precedent study, an experiment was carried out using this new process to simulate a client’s design decisions on window and interior furnishings. The choices made by the client using VR automatically updated a B/Q schedule built in Revit and allowed them to have a firm understanding of project costs. Besides giving the client more confidence in a pleasing final outcome, the technology also ensured an up-to-date, accurate, and easily understandable B/Q. The proposed method features great potential savings in cost and time and gives the B/Q a newfound importance in future construction processes. The research case presented in this paper is a stepping stone in exploring new opportunities offered by VR and BIM and how they could improve the reliability and accuracy of traditional procurement within construction, specifically within the B/Q document.

Keywords virtual reality      bill of quantities      BIM      Revit      real-time synchronisation     
Corresponding Author(s): Farzad Pour RAHIMIAN   
Just Accepted Date: 05 May 2019   Online First Date: 18 June 2019    Issue Date: 06 August 2020
 Cite this article:   
Jordan DAVIDSON,John FOWLER,Charalampos PANTAZIS, et al. Integration of VR with BIM to facilitate real-time creation of bill of quantities during the design phase: A proof of concept study[J]. Front. Eng, 2020, 7(3): 396-403.
 URL:  
https://academic.hep.com.cn/fem/EN/10.1007/s42524-019-0039-y
https://academic.hep.com.cn/fem/EN/Y2020/V7/I3/396
Fig.1  Framework of the prototype
Fig.2  Revit model immersed in VR
Fig.3  Sample window schedule
Fig.4  Sample living room furniture schedule
Fig.5  Prototype tests showing changes in furniture
Fig.6  Participant making changes within the VR
1 D Agency (2018). IKEA Virtual Reality Showroom. Demodern Digitalagentur
2 S Bandi, F Abdullah, R Amiruddin (2014). Recapitulating the issues concerning the applications of the bills of quantities. International Journal of Built Environment and Sustainability, 1(1): 63–70
https://doi.org/10.11113/ijbes.v1.n1.10
3 R Bille, S P Smith, K Maund, G Brewer (2014). Extending Building Information Models into Game Engines. New York: ACM Press
4 D Bouchlaghem, H Shang, J Whyte, A Ganah (2005). Visualisation in architecture, engineering and construction (AEC). Automation in Construction, 14(3): 287–295
https://doi.org/10.1016/j.autcon.2004.08.012
5 S E Chen (1995). Quicktime VR: An Image-based Approach to Virtual Environment Navigation. In: 22nd Annual Conference on Computer Graphics and Interactive Techniques, 29–38
6 C Corke (2017). Review: From Revit to VR. AEC Magazine, technology-mainmenu-35/1255
7 P R Davis, P E D Love, D Baccarini (2009). Bills of quantities: Nemesis or nirvana? Structural Survey, 27(2): 99–108
https://doi.org/10.1108/02630800910956434
8 C Donalek, S G Djorgovski, A Cioc, A Wang, J Zhang, E Lawler, S Yeh, A Mahabal, M Graham, A Drake, S Davidoff, J S Norris, G Longo (2014). Immersive and Collaborative Data Visualization Using Virtual Reality Platforms. 2014 IEEE International Conference on Big Data, 609–614
9 J Du, Z Zou, Y Shi, D Zhao (2018). Zero latency: Real-time synchronization of BIM data in virtual reality for collaborative decision-making. Automation in Construction, 85: 51–64
https://doi.org/10.1016/j.autcon.2017.10.009
10 JELD-WEN (2000). Interior and Exterior Doors, Windows, Patio Doors, Stairs. JELD-WEN
11 S Laryea (2011). Quality of tender documents: Case studies from the UK. Construction Management and Economics, 29(3): 275–286
https://doi.org/10.1080/01446193.2010.540019
12 H Li, P E D Love (1998). Visualization of Building Interior Design to Reduce Rework. IEEE Conference on Information Visualization, An International Conference on Computer Visualization and Graphics (Cat. No.98TB100246), 187–191
13 M Lorenz, M Spranger, T Riedel, F Pürzel, V Wittstock, P Klimant (2016). CAD to VR — A methodology for the automated conversion of kinematic CAD models to virtual reality. Procedia CIRP, 41: 358–363
https://doi.org/10.1016/j.procir.2015.12.115
14 M Martínez-Rojas, N Marín, M A V Miranda (2016). An intelligent system for the acquisition and management of information from bill of quantities in building projects. Expert Systems with Applications, 63: 284–294
https://doi.org/10.1016/j.eswa.2016.07.011
15 J I Messner, S C Yerrapathruni, A J Baratta, V E Whisker (2003). Using Virtual Reality to Improve Construction Engineering Education. American Society for Engineering Education Annual Conference & Exposition
16 A Nadeem, A K Wong, F K W Wong (2015). Bill of quantities with 3D views using building information modeling. Arabian Journal for Science and Engineering, 40(9): 2465–2477
https://doi.org/10.1007/s13369-015-1657-2
17 H Odeyinka, S Perera (2009). An evaluation of the budgetary reliability of bills of quantities in building procurement. COBRA 2009, Royal Institution of Chartered Surveyors (RICS), London, UK, 435–446
18 O A Olatunji (2011). Virtual reality and estimating practice: A software selection model for estimating. Practice, 11: 13
19 E A Petrova, M Rasmussen, R L Jensen, K Svidt (2017). Integrating Virtual Reality and BIM for End-user Involvement in Building Design: A Case Study. The Joint Conference on Computing in Construction (JC3), 699–706
20 F P Rahimian, V Chavdarova, S Oliver, F Chamo (2019). OpenBIM-Tango integrated virtual showroom for offsite manufactured production of self-build housing. Automation in Construction, 102: 1–16
https://doi.org/10.1016/j.autcon.2019.02.009
21 R A Rashid, M Mustapa, S N A Wahid (2006). Bills of Quantities — Are they still useful and relevant today? International Conference on Construction Industry
22 A Razali, A Tajudin, A Fadzli (2014). Applicability of bill of quantities in construction procurement. International Journal of Engineering Science Invention, 3(7): 31–34
23 Y Shi, J Du, S Lavy, D Zhao (2016). A multiuser shared virtual environment for facility management. Procedia Engineering, 145: 120–127
https://doi.org/10.1016/j.proeng.2016.04.029
24 D Sinclair (2013). RIBA Plan of Work 2013 Overview. Royal Institute of British Architects, London, UK
25 X Wang, M A Schnabel (2008). Mixed Reality in Architecture, Design, and Construction. Berlin: Springer
26 K Warwick, J O Gray, D Roberts (1993). Institution of Electrical, Virtual reality in engineering. Institution of Electrical Engineers, ISBN 0 85296 803 5
27 D Weidlich, L Cser, T Polzin, D Cristiano, H Zickner (2007). Virtual reality approaches for immersive design. CIRP Annals, 56(1): 139–142
https://doi.org/10.1016/j.cirp.2007.05.034
28 Zerolight L (2018). Zerolight. Available at Zerolight website on March 4, 2019
29 K Zima (2017). Impact of information included in the BIM on preparation of Bill of Quantities. Procedia Engineering, 208: 203–210
https://doi.org/10.1016/j.proeng.2017.11.039
[1] Berardo NATICCHIA, Alessandra CORNELI, Alessandro CARBONARI. Framework based on building information modeling, mixed reality, and a cloud platform to support information flow in facility management[J]. Front. Eng, 2020, 7(1): 131-141.
[2] Elodie HOCHSCHEID, Gilles HALIN. Generic and SME-specific factors that influence the BIM adoption process: An overview that highlights gaps in the literature[J]. Front. Eng, 2020, 7(1): 119-130.
[3] Veronika BOLSHAKOVA, Annie GUERRIERO, Gilles HALIN. Identifying stakeholders’ roles and relevant project documents for 4D-based collaborative decision making[J]. Front. Eng, 2020, 7(1): 104-118.
[4] Alessandro CARBONARI, Leonardo MESSI, Berardo NATICCHIA, Massimo VACCARINI, Massimiliano PIRANI. Development of a BIM-based holonic system for real-time monitoring of building operational efficiency[J]. Front. Eng, 2020, 7(1): 89-103.
[5] Ying ZHOU, Wan WANG, Hanbin LUO, Yan ZHANG. Virtual pre-assembly for large steel structures based on BIM, PLP algorithm, and 3D measurement[J]. Front. Eng, 2019, 6(2): 207-220.
[6] Albert P. C. CHAN, Xiaozhi MA, Wen YI, Xin ZHOU, Feng XIONG. Critical review of studies on building information modeling (BIM) in project management[J]. Front. Eng, 2018, 5(3): 394-406.
[7] Chong-guang Feng,Hao Hu,Feng Xu,Jian Yang. An Intelligent Logistics Management Model in Prefabricated Construction[J]. Front. Eng, 2015, 2(2): 178-181.
[8] Ting Gong,Jian Yang,Hao Hu,Feng Xu. Construction Technology of Off-Site Precast Concrete Buildings[J]. Front. Eng, 2015, 2(2): 122-124.
[9] Burcu Akinci. Situational Awareness in Construction and Facility Management[J]. Front. Eng, 2014, 1(3): 283-289.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed