Please wait a minute...
Frontiers of Engineering Management

ISSN 2095-7513

ISSN 2096-0255(Online)

CN 10-1205/N

Postal Subscription Code 80-905

Front. Eng    2019, Vol. 6 Issue (3) : 457-462    https://doi.org/10.1007/s42524-019-0053-0
SUPER ENGINEERING
Fully automatic container terminals of Shanghai Yangshan Port phase IV
Jack Xunjie LUO()
Tianjin Port (Group) Co., Ltd., Tianjin 300461, China
 Download: PDF(2692 KB)   HTML
 Export: BibTeX | EndNote | Reference Manager | ProCite | RefWorks
Abstract

Engineering Owner: Construction Headquarters of Yangshan Deep-water Port Phase IV Project of Shanghai International Shipping Center

Designer: CCCC Third Harbor Consultants Co., Ltd.

Civil Constructer: China State Construction Harbor Construction Co., Ltd.;

CCCC Third Harbor Engineering Co., Ltd.

Equipment Manufacturer: Shanghai Zhenhua Port Machinery Co., Ltd.

Software Developer and System Integrator: Shanghai Harbor e-Logistics Software Co., Ltd. of Shanghai International Port (Group) Co., Ltd.

Supervisor: Shanghai Far East Waterway Engineering Construction Supervision and Consultation Co., Ltd.;

Shanghai Donghua Construction Management Co., Ltd.;

Jinghua Engineering Supervision Co., Ltd. under CCCC Water Transportation Consultants Co., Ltd.

Operator: Shangdong Branch, Shanghai International Port (Group) Co., Ltd.

Keywords Yangshan Port      automated equipment      intelligent system      container terminals      port engineering     
Corresponding Author(s): Jack Xunjie LUO   
Just Accepted Date: 12 July 2019   Online First Date: 23 August 2019    Issue Date: 04 September 2019
 Cite this article:   
Jack Xunjie LUO. Fully automatic container terminals of Shanghai Yangshan Port phase IV[J]. Front. Eng, 2019, 6(3): 457-462.
 URL:  
https://academic.hep.com.cn/fem/EN/10.1007/s42524-019-0053-0
https://academic.hep.com.cn/fem/EN/Y2019/V6/I3/457
Fig.1  A glimpse of the fully automated terminals of Yangshan phase IV.
Fig.2  The quay apron of Yangshan phase IV.
Fig.3  A panorama of Yangshan phase IV project in equipment commissioning.
Fig.4  Remotely controlled automated quay cranes (RC-AQCs).
Fig.5  Automated rail-mounted gantries (ARMGs) in Yangshan phase IV.
Fig.6  AGVs using automatically-replaced batteries which supports automated lifting.
Fig.7  Structures of TOS and ECS.
Fig.8  Nine AQCs work together to handle a trip-E ultra-large ship.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed