Please wait a minute...
Frontiers of Engineering Management

ISSN 2095-7513

ISSN 2096-0255(Online)

CN 10-1205/N

Postal Subscription Code 80-905

Front. Eng    2022, Vol. 9 Issue (2) : 349-353    https://doi.org/10.1007/s42524-022-0187-3
SUPER ENGINEERING
Management innovation and construction integration technology in Brazil’s superlarge deep-water offshore oil and gas unit project (FPSO P67/P70)
Fuwen TAO, Shengqiang WANG(), Qingwu SONG
Offshore Oil Engineering Co., Ltd., Tianjin 300461, China
 Download: PDF(692 KB)   HTML
 Export: BibTeX | EndNote | Reference Manager | ProCite | RefWorks
Keywords Brazil FPSO P67/P70      superlarge      dry towing operation      construction integration      risk control management     
Corresponding Author(s): Shengqiang WANG   
Just Accepted Date: 13 January 2022   Online First Date: 01 March 2022    Issue Date: 25 May 2022
 Cite this article:   
Fuwen TAO,Shengqiang WANG,Qingwu SONG. Management innovation and construction integration technology in Brazil’s superlarge deep-water offshore oil and gas unit project (FPSO P67/P70)[J]. Front. Eng, 2022, 9(2): 349-353.
 URL:  
https://academic.hep.com.cn/fem/EN/10.1007/s42524-022-0187-3
https://academic.hep.com.cn/fem/EN/Y2022/V9/I2/349
Fig.1  Module lifting and integration for FPSO P67.
Fig.2  FPSO P70 dry tow loading.
Fig.3  Schematic of FPSO P67 hull and topside modules transportation.
Fig.4  Project risk management and control mechanism based on matrix analysis.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed