1 |
Abramson L Y, Seligman M E, Teasdale J D (1978). Learned helplessness in humans: Critique and reformulation. Journal of Abnormal Psychology, 87(1): 49–74
https://doi.org/10.1037/0021-843X.87.1.49
|
2 |
Adebisi O (1989). The Challenge of independence: Major issue before and after. In: Tamuno, N.T. and Atanda, J.A., eds. Nigeria since Independence in the first 25 years. Ibadan: Heinemann Educational Books, Nigeria Limited.
|
3 |
Ahmed S M, Kangari R (1995). Analysis of client-satisfaction factors in construction industry. Journal of Management Engineering, 11(2): 36–44
https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(36)
|
4 |
Akeju R (2018). FG needs $652m to reactivate Ajaokuta Steel equipment. , 2018–6-12
|
5 |
Al-Amin M A (2013). Energy efficiency alternatives in the Ajoakuta Steel Project of Nigeria. International Journal of Advanced Research, 1: 592–599
|
6 |
Andersen E S, Birchall D, Jessen S A, Money A H (2006). Exploring project success. Baltic Journal of Management, 1(2): 127–147
https://doi.org/10.1108/17465260610663854
|
7 |
Baccarini D (1996). The concept of project complexity—A review. International Journal of Project Management, 14(4): 201–204
https://doi.org/10.1016/0263-7863(95)00093-3
|
8 |
Balfour R, Mitchell C, Moletsane R (2008). Troubling contexts: Toward a generative theory of rurality as education research. Journal of Rural and Community Development, 3: 95–107
|
9 |
Baloi D, Price A D F (2003). Modelling global risk factors affecting construction cost performance. International Journal of Project Management, 21(4): 261–269
https://doi.org/10.1016/S0263-7863(02)00017-0
|
10 |
Barbour K M (1972). Planning for Nigeria: A Geographical Approach. Ibadan: Ibadan University Press
|
11 |
Beazley C (2009). The many sides of optimism. Positive Psychology, United Kingdom
|
12 |
Boehm B (2000). Project termination doesn’t equal project failure. Computer, 33(7): 94–96
https://doi.org/10.1109/2.868706
|
13 |
Bolden R, Gosling J, Marturano A, Dennison P (2003). Leadership Theory and Competency Frameworks. Exeter: Centre for Leadership Studies
|
14 |
Boyd D, Chinyio E (2006). Understanding the Construction Client. Oxford: Blackwell Publishing
|
15 |
Buckley P J, Casson M (2010). In: Buckley P J, Casson M, eds. The Multinational Enterprise Revisited. Berlin: Springer
|
16 |
Cabrera D, Colosi L, Lobdell C (2008). Systems thinking. Evaluation and Program Planning, 31(3): 299–310
https://doi.org/10.1016/j.evalprogplan.2007.12.001
|
17 |
Carver C S, Scheier M F (2014). Dispositional optimism. Trends in Cognitive Sciences, 18(6): 293–299
https://doi.org/10.1016/j.tics.2014.02.003
|
18 |
Chan A P C (2001). Framework for Measuring Success of Projects. Cooperative Research Centre for Construction, Queensland University of Technology, Brisbane, Australia
|
19 |
Checkland P (1999). Systems Thinking, Systems Practice: Includes a 30-Year Retrospective. Chichester: John Wiley and Sons Ltd
|
20 |
Cleland D I (1995). Leadership and the project-management body of knowledge. International Journal of Project Management, 13(2): 83–88
https://doi.org/10.1016/0263-7863(94)00018-8
|
21 |
Collins A, Baccarini D (2004). Project success—A survey. Journal of Construction Research, 5(2): 211–231
https://doi.org/10.1142/S1609945104000152
|
22 |
Cooke-Davies T (2011). In: T. Cooke-Davies, L. Crawford, J. Patton, C. Stevens and T. Williams, eds. Aspects of Complexity: Managing in a Complex World. Newtown Square: Project Management Institute
|
23 |
Crowe S E (1942). The Berlin West African Conference, 1884–1885. New York: Longman
|
24 |
De Meyer A, Loch C H, Pich M T (2002). Managing project uncertainty: From variation to chaos. MIT Sloan Management Review, 43: 60
|
25 |
De Wit A (1988). Measurement of project success. International Journal of Project Management, 6(3): 164–170
https://doi.org/10.1016/0263-7863(88)90043-9
|
26 |
Ekeh P P (1975). Colonialism and the two publics in Africa: A theoretical statement. Comparative Studies in Society and History, 17(01): 91–112
https://doi.org/10.1017/S0010417500007659
|
27 |
Emeriewen K O, Kalilu R O R (2015). Emerging trends in blacksmithing in Benin City, Nigeria. Journal of Science and Technology of the Arts, 7(2): 70–76
https://doi.org/10.7559/citarj.v7i2.153
|
28 |
Falola T (2004). Economic Reforms and Modernization in Nigeria, 1945–1965. Kent: Kent State University Press
|
29 |
Fiedler (1967). A Theory of Leadership Effectiveness. New York: McGraw-Hill
|
30 |
, Flyvbjerg B, Skramis-Holm M K, Buhl S (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68(3): 279–295
https://doi.org/10.1080/01944360208976273
|
31 |
Flyvbjerg B (2006). From Nobel Prize to project management. Project Management Institute Journal, 37(3): 5–15
https://doi.org/10.1177/875697280603700302
|
32 |
Flyvbjerg B (2007). Cost overruns and demand shortfalls in urban rail and other infrastructure. Transportation Planning and Technology, 30: 9–30
https://doi.org/10.1002/pmj.21409
|
34 |
Flyvbjerg B (2016). Introduction: The Iron Law of Megaproject Management. Oxford: Oxford University Press
|
35 |
Flyvbjerg B, Garbuio M, Lovallo D (2013). Delusion and deception in large infrastructure projects: Two models for explaining and preventing executive disaster. California Management Review, 51 (2): 170–193
|
36 |
Geraldi J G (2009). Reconciling order and chaos in multi-project firms. International Journal of Managing Projects in Business, 2(1): 149–158
https://doi.org/10.1108/17538370910930572
|
37 |
Grandia J (2016). Finding the missing link: Examining the mediating role of sustainable public procurement behaviour. Journal of Cleaner Production, 124: 183–190
https://doi.org/10.1016/j.jclepro.2016.02.102
|
38 |
Grudinschi D, Sintonen S, Hallikas J (2014). Relationship risk perception and determinants of the collaboration fluency of buyer–supplier relationships in public service procurement. Journal of Purchasing and Supply Management, 20(2): 82–91
https://doi.org/10.1016/j.pursup.2014.03.004
|
39 |
Hersey P, Blanchard K H (1977). Management of Organizational Behaviour. Englewood Cliffs: Prentice Hall
|
40 |
Hobday M (2000). The project-based organisation: An ideal form for managing complex products and systems? Research Policy, 29(7-8): 871–893
https://doi.org/10.1016/S0048-7333(00)00110-4
|
41 |
Hu Y, Chan A, Le Y (2012). Conceptual framework of program organization for managing construction megaprojects—Chinese client’s perspective. In: Proceedings of Engineering Project Organizations Conference. Rheden
|
42 |
Hylighen F, Joslyn C (1995). In: Audi R, eds. Cambridge Dictionary of Philosophy. Cambridge: Cambridge University Press
|
43 |
Isa H, Hassan P, Takim R, Mat M, Ithnin Z (2010). How adequate is adequate? A case of the adequacy in determining client requirements in the construction of four public hospitals in Malaysia. In: Proceedings of W092-Special Track 18th CIB World Building Congress. Salford: 248–261
|
44 |
Jelodar M B, Yiu T W, Wilkinson S (2016). A conceptualisation of relationship quality in construction procurement. International Journal of Project Management, 34(6): 997–1011
https://doi.org/10.1016/j.ijproman.2016.03.005
|
45 |
Jensen N, Wantchekon L (2004). Resource wealth and political regimes in Africa. Comparative Political Studies, 37(7): 816–841
https://doi.org/10.1177/0010414004266867
|
46 |
Jorre J D S (1972). The Nigerian Civil War. London: Hodder and Stoughton Ltd
|
47 |
Kamara J M, Anumba C J, Evbuomwan N F O (2002). Capturing Client Requirements in Construction Projects. London: Thomas Telford Publishing
|
48 |
Kellert S H (1994). In the Wake of Chaos: Unpredictable Order in Dynamical Systems. Chicago: University of Chicago press
|
49 |
Killick D (2004). What do we know about African iron working? Journal of African Archaeology, 2(1): 97–112
|
50 |
Kometa S T, Olomolaiye P O, Harris F C (1995). An evaluation of clients’ needs and responsibilities in the construction process. Engineering, Construction, and Architectural Management, 2(1): 57–76
https://doi.org/10.1108/eb021003
|
51 |
Lenfle S (2011). The strategy of parallel approaches in projects with unforeseeable uncertainty: The Manhattan case in retrospect. International Journal of Project Management, 29(4): 359–373
https://doi.org/10.1016/j.ijproman.2011.02.001
|
52 |
Love P E D, Simpson I, Smith J, Regan M, Olatunji O A (2015). Understanding the landscape of overruns in transport infrastructure projects. Environment & Planning B, 42(3): 490–509
https://doi.org/10.1068/b130102p
|
53 |
Love P E D, Smith J (2016). Toward error management in construction: Moving beyond a zero vision. Journal of Construction Engineering and Management, 142 (11): 04016058
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001170
|
54 |
Lundin R, Soderholm A (1995). A theory of the temporary organization. Scandinavian Journal of Management, 11(4): 437–455
https://doi.org/10.1016/0956-5221(95)00036-U
|
55 |
Manning C, Fruehan R (2001). Emerging technologies for iron and steelmaking. Journal of Materials, 53: 36–43
|
56 |
Markus M L, Tanis C (2000). The enterprise systems experience—from adoption to success. Framing the Domains of IT Research: Glimpsing the Future through the Past, 173: 207–173
|
57 |
Matusevich M (2003). No Easy Row for a Russian Hoe: Ideology and Pragmatism in Nigerian-Soviet Relations, 1960–1991. Trenton: Africa World Press
|
58 |
McGregor D (1960). The Human Side of Enterprise. New York: McGraw Hill
|
59 |
Mohammad-Hasanzadeh S, Hosseinalipour M, Hafezi M (2014). Collaborative procurement in construction projects performance measures, case study: Partnering in Iranian construction industry. Procedia: Social and Behavioral Sciences, 119: 811–818
https://doi.org/10.1016/j.sbspro.2014.03.091
|
60 |
Murphy P (1996). Chaos theory as a model for managing issues and crises. Public Relations Review, 22(2): 95–113
https://doi.org/10.1016/S0363-8111(96)90001-6
|
61 |
Murray P (2003). The Saga of Sydney Opera House: The Dramatic Story of the Design and Construction of the Icon of Modern Australia. London: Routledge
|
62 |
Naoum S, Egbu C (2015). Critical review of procurement method research in construction journals. Procedia Economics and Finance, 21: 6–13
https://doi.org/10.1016/S2212-5671(15)00144-6
|
63 |
Norem J K (2001). Optimism and Pessimism: Implications for Theory, Research, and Practice. Washington, D.C.: American Psychological Association
|
64 |
Ogunlana S O (2010). Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. International Journal of Project Management, 28(3): 228–236
https://doi.org/10.1016/j.ijproman.2009.05.005
|
65 |
Olaniran O J, Love P E D, Edwards D, Olatunji O A, Matthews J (2015). Cost overruns in hydrocarbon megaprojects: A critical review and implications for research. Project Management Journal, 46(6): 126–138
https://doi.org/10.1002/pmj.21556
|
66 |
Olaniran O J, Love P E D, Edwards D J, Olatunji O, Matthews J (2017). Chaos theory: Implications for cost overrun research in hydrocarbon megaprojects. Journal of Construction Engineering and Management, 143(2): 05016020
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001227
|
67 |
Olatunji O A, Ajayi S O (2017). Rurality, Nigeria’s massification policy on access to basic education and turnover causations amongst teachers. Australian and International Journal of Rural Education, 26: 3–17
|
68 |
Oyeyinka O, Adeloye O (1988). Technological change and project execution: Evolution of Ajaokuta Steel Plant in Nigeria. International Development Research Centre, Canada
|
69 |
Packendorff J (1995). Inquiring into the temporary organization: New directions for project management research. Scandinavian Journal of Management, 11(4): 319–333
https://doi.org/10.1016/0956-5221(95)00018-Q
|
70 |
Pich M T, Loch C H, Meyer A D (2002). On uncertainty, ambiguity, and complexity in project management. Management Science, 48(8): 1008–1023
https://doi.org/10.1287/mnsc.48.8.1008.163
|
71 |
Pinto J K, Mantel S J (1990). The causes of project failure. IEEE Transactions on Engineering Management, 37(4): 269–276
https://doi.org/10.1109/17.62322
|
72 |
Pinto J K, Slevin D P (1988). Project Success: Definitions and Measurement Techniques. Newtown Square: Project Management Institute
|
73 |
Priemus H (2010). Mega-projects: Dealing with pitfalls. European Planning Studies, 18(7): 1023–1039
https://doi.org/10.1080/09654311003744159
|
74 |
Pryor R G L, Bright J E H (2007). Applying chaos theory to careers: Attraction and attractors. Journal of Vocational Behavior, 71(3): 375–400
https://doi.org/10.1016/j.jvb.2007.05.002
|
75 |
Rausch E, Barber E, Warn J (2005). Leadership in project management: From firefighter to firelighter. Management Decision, 43(7/8): 1032–1039
https://doi.org/10.1108/00251740510610026
|
76 |
Reichl L E (2004). The Transition to Chaos. Berlin: Springer
|
77 |
Reigeluth C M (2004). Chaos theory and the sciences of complexity: Foundations for transforming education. In: Proceedings of Annual Meeting of the American Educational Research Association. San Diego
|
78 |
Relle B, Gilge C (2013). How to successfully manage your mega-project.
|
79 |
Robertson R, Combs A (2014). Chaos Theory in Psychology and the Life Sciences. London: Psychology Press
|
80 |
Schuldberg D (2011). In: Runco M A, Pritzker S R, eds. Encyclopedia of Creativity. San Diego: Academic Press
|
81 |
Sellnow T L, Seeger M W, Ulmer R R (2002). Chaos theory, informational needs, and natural disasters. Journal of Applied Communication Research, 30(4): 269–292
https://doi.org/10.1080/00909880216599
|
82 |
Shafritz J, Ott J, Jang Y (2015). Classics of Organization Theory. Boston: Cengage Learning
|
83 |
Shenhar A J, Dvir D (2007). Project management research—the challenge and opportunity. Project Management Journal, 38(2): 93–99
https://doi.org/10.1177/875697280703800210
|
84 |
Shepherd D A, Patzelt H, Wolfe M (2011). Moving forward from project failure: Negative emotions, affective commitment, and learning from the experience. Academy of Management Journal, 54(6): 1229– 1259
https://doi.org/10.5465/amj.2010.0102
|
85 |
Smith J, Love P E D (2004). Stakeholder management during project inception: Strategic needs analysis. Journal of Architectural Engineering, 10(1): 22–33
https://doi.org/10.1061/(ASCE)1076-0431(2004)10:1(22)
|
86 |
Smith W K, Lewis M W (2011). Toward a theory of paradox: A dynamic equilibrium model of organizing. Academy of Management Review, 36: 381–403
|
87 |
Spencer S M, Norem J K (1996). Reflection and distraction defensive pessimism, strategic optimism, and performance. Personality and Social Psychology Bulletin, 22(4): 354–365
https://doi.org/10.1177/0146167296224003
|
88 |
Tannenbaum R, Schmidt W (1958). How to choose a leadership pattern. Harvard Business Review, 36: 95–101
|
89 |
Turner J R (2008). Handbook of Project-based Management. New York: McGraw-Hill Professional Publishing
|
90 |
Walker D H (1995). An investigation into construction time performance. Construction Management and Economics, 13(3): 263– 274
https://doi.org/10.1080/01446199500000030
|
91 |
Williams P H (1964). The industrialization of nigeria. In: Proceedings of the Oklahoma Academy of Science: Geography. 215–218
|
92 |
Xenophon (1869). The Anabasis or Expedition of Cyrus and the Memorabilia of Socrates. New York: Karper and Row
|
93 |
Xie Y, Zilberman D (2014). The economics of water project capacities and conservation technologies. In: Proceedings of Agricultural and Applied Economics Association 2014 Annual Meeting
|
94 |
Zervas T, McMullan J T, Williams B C (1996). Developments in iron and steel making. International Journal of Energy Research, 20(1): 69–91
https://doi.org/10.1002/(SICI)1099-114X(199601)20:1<69::AID-ER241>3.0.CO;2-3
|