RESEARCH ARTICLE
Causations of failure in megaprojects: A case study of the Ajaokuta Steel Plant project
Oluwole Alfred OLATUNJI()
Construction Management, School of Design and Built Environment, Curtin University, Bentley WA 6102, Australia
 Download: PDF(183 KB)   HTML
 Export: BibTeX | EndNote | Reference Manager | ProCite | RefWorks
Abstract

This paper uses project organizational theories to draw lessons from a historic megaproject, the Ajaokuta Steel Plant (ASP). Archival reports on the ASP were explored to identify the unique attributes of the project; the political wrangling that underplayed its evolution, its economic significance and organizational impacts. Findings suggest the goals of the ASP project were, and still are, unambiguous. Failure occurred as socio-political forces aggravated the project’s complex milestones. Stakeholders were impatient with pre-project investigations. During planning, owners ignored opinions that were contrary to their expectations. While delays lingered, pressures from the global economy weakened the project’s motivation to succeed. These combined to turn the project’s outcomes into a chaotic situation that triggered dire implications. Despite about 1400% overrun in cost, the success achieved on the plant was 28% at commissioning. Contractors remained on site until eight years after commissioning. Six key elements of the 482 items in the ASP project contract were not delivered nearly 40 years on. A simplistic look at these suggests poor planning is the main problem. However, planning issues is not entirely strange in greenfield projects. The paper draws strength from project organization theories to explain what was poor about the planning. Socrates’ generic management theory was used to explain the role of leadership in the failure of the ASP project. McGregor’s Theory X and Theory Y explain the significance of stakeholders’ integration in megaprojects. Systems and chaos theories were used to explain the sensitivity of the ASP project to uncertainties. Narratives on these combine well to inspire stakeholders of megaprojects on where and how to seek courage in making effective plans that can help achieve success in complex projects. While normative literature only recognizes project success in a definitive perspective, this study provides insights from failure as an instrument to trigger sublime reflections.

Keywords industrial projects      megaprojects      Nigeria      project organizational theories      steel plant     
Corresponding Author(s): Oluwole Alfred OLATUNJI   
Just Accepted Date: 09 July 2018   Online First Date: 23 August 2018    Issue Date: 14 September 2018
 Cite this article:   
Oluwole Alfred OLATUNJI. Causations of failure in megaprojects: A case study of the Ajaokuta Steel Plant project[J]. Front. Eng, 2018, 5(3): 334-346.
 URL:  
https://academic.hep.com.cn/fem/EN/10.15302/J-FEM-2018011
https://academic.hep.com.cn/fem/EN/Y2018/V5/I3/334
1 Abramson L Y, Seligman M E, Teasdale J D (1978). Learned helplessness in humans: Critique and reformulation. Journal of Abnormal Psychology, 87(1): 49–74
https://doi.org/10.1037/0021-843X.87.1.49
2 Adebisi O (1989). The Challenge of independence: Major issue before and after. In: Tamuno, N.T. and Atanda, J.A., eds. Nigeria since Independence in the first 25 years. Ibadan: Heinemann Educational Books, Nigeria Limited.
3 Ahmed S M, Kangari R (1995). Analysis of client-satisfaction factors in construction industry. Journal of Management Engineering, 11(2): 36–44
https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(36)
4 Akeju R (2018). FG needs $652m to reactivate Ajaokuta Steel equipment. , 2018–6-12
5 Al-Amin M A (2013). Energy efficiency alternatives in the Ajoakuta Steel Project of Nigeria. International Journal of Advanced Research, 1: 592–599
6 Andersen E S, Birchall D, Jessen S A, Money A H (2006). Exploring project success. Baltic Journal of Management, 1(2): 127–147
https://doi.org/10.1108/17465260610663854
7 Baccarini D (1996). The concept of project complexity€—€A review. International Journal of Project Management, 14(4): 201–204
https://doi.org/10.1016/0263-7863(95)00093-3
8 Balfour R, Mitchell C, Moletsane R (2008). Troubling contexts: Toward a generative theory of rurality as education research. Journal of Rural and Community Development, 3: 95–107
9 Baloi D, Price A D F (2003). Modelling global risk factors affecting construction cost performance. International Journal of Project Management, 21(4): 261–269
https://doi.org/10.1016/S0263-7863(02)00017-0
10 Barbour K M (1972). Planning for Nigeria: A Geographical Approach. Ibadan: Ibadan University Press
11 Beazley C (2009). The many sides of optimism. Positive Psychology, United Kingdom
12 Boehm B (2000). Project termination doesn’t equal project failure. Computer, 33(7): 94–96
https://doi.org/10.1109/2.868706
13 Bolden R, Gosling J, Marturano A, Dennison P (2003). Leadership Theory and Competency Frameworks. Exeter: Centre for Leadership Studies
14 Boyd D, Chinyio E (2006). Understanding the Construction Client. Oxford: Blackwell Publishing
15 Buckley P J, Casson M (2010). In: Buckley P J, Casson M, eds. The Multinational Enterprise Revisited. Berlin: Springer
16 Cabrera D, Colosi L, Lobdell C (2008). Systems thinking. Evaluation and Program Planning, 31(3): 299–310
https://doi.org/10.1016/j.evalprogplan.2007.12.001
17 Carver C S, Scheier M F (2014). Dispositional optimism. Trends in Cognitive Sciences, 18(6): 293–299
https://doi.org/10.1016/j.tics.2014.02.003
18 Chan A P C (2001). Framework for Measuring Success of Projects. Cooperative Research Centre for Construction, Queensland University of Technology, Brisbane, Australia
19 Checkland P (1999). Systems Thinking, Systems Practice: Includes a 30-Year Retrospective. Chichester: John Wiley and Sons Ltd
20 Cleland D I (1995). Leadership and the project-management body of knowledge. International Journal of Project Management, 13(2): 83–88
https://doi.org/10.1016/0263-7863(94)00018-8
21 Collins A, Baccarini D (2004). Project success—A survey. Journal of Construction Research, 5(2): 211–231
https://doi.org/10.1142/S1609945104000152
22 Cooke-Davies T (2011). In: T. Cooke-Davies, L. Crawford, J. Patton, C. Stevens and T. Williams, eds. Aspects of Complexity: Managing in a Complex World. Newtown Square: Project Management Institute
23 Crowe S E (1942). The Berlin West African Conference, 1884–1885. New York: Longman
24 De Meyer A, Loch C H, Pich M T (2002). Managing project uncertainty: From variation to chaos. MIT Sloan Management Review, 43: 60
25 De Wit A (1988). Measurement of project success. International Journal of Project Management, 6(3): 164–170
https://doi.org/10.1016/0263-7863(88)90043-9
26 Ekeh P P (1975). Colonialism and the two publics in Africa: A theoretical statement. Comparative Studies in Society and History, 17(01): 91–112
https://doi.org/10.1017/S0010417500007659
27 Emeriewen K O, Kalilu R O R (2015). Emerging trends in blacksmithing in Benin City, Nigeria. Journal of Science and Technology of the Arts, 7(2): 70–76
https://doi.org/10.7559/citarj.v7i2.153
28 Falola T (2004). Economic Reforms and Modernization in Nigeria, 1945–1965. Kent: Kent State University Press
29 Fiedler (1967). A Theory of Leadership Effectiveness. New York: McGraw-Hill
30 , Flyvbjerg B, Skramis-Holm M K, Buhl S (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68(3): 279–295
https://doi.org/10.1080/01944360208976273
31 Flyvbjerg B (2006). From Nobel Prize to project management. Project Management Institute Journal, 37(3): 5–15
https://doi.org/10.1177/875697280603700302
32 Flyvbjerg B (2007). Cost overruns and demand shortfalls in urban rail and other infrastructure. Transportation Planning and Technology, 30: 9–30
https://doi.org/10.1002/pmj.21409
34 Flyvbjerg B (2016). Introduction: The Iron Law of Megaproject Management. Oxford: Oxford University Press
35 Flyvbjerg B, Garbuio M, Lovallo D (2013). Delusion and deception in large infrastructure projects: Two models for explaining and preventing executive disaster. California Management Review, 51 (2): 170–193
36 Geraldi J G (2009). Reconciling order and chaos in multi-project firms. International Journal of Managing Projects in Business, 2(1): 149–158
https://doi.org/10.1108/17538370910930572
37 Grandia J (2016). Finding the missing link: Examining the mediating role of sustainable public procurement behaviour. Journal of Cleaner Production, 124: 183–190
https://doi.org/10.1016/j.jclepro.2016.02.102
38 Grudinschi D, Sintonen S, Hallikas J (2014). Relationship risk perception and determinants of the collaboration fluency of buyer–supplier relationships in public service procurement. Journal of Purchasing and Supply Management, 20(2): 82–91
https://doi.org/10.1016/j.pursup.2014.03.004
39 Hersey P, Blanchard K H (1977). Management of Organizational Behaviour. Englewood Cliffs: Prentice Hall
40 Hobday M (2000). The project-based organisation: An ideal form for managing complex products and systems? Research Policy, 29(7-8): 871–893
https://doi.org/10.1016/S0048-7333(00)00110-4
41 Hu Y, Chan A, Le Y (2012). Conceptual framework of program organization for managing construction megaprojects€—€Chinese client’s perspective. In: Proceedings of Engineering Project Organizations Conference. Rheden
42 Hylighen F, Joslyn C (1995). In: Audi R, eds. Cambridge Dictionary of Philosophy. Cambridge: Cambridge University Press
43 Isa H, Hassan P, Takim R, Mat M, Ithnin Z (2010). How adequate is adequate? A case of the adequacy in determining client requirements in the construction of four public hospitals in Malaysia. In: Proceedings of W092-Special Track 18th CIB World Building Congress. Salford: 248–261
44 Jelodar M B, Yiu T W, Wilkinson S (2016). A conceptualisation of relationship quality in construction procurement. International Journal of Project Management, 34(6): 997–1011
https://doi.org/10.1016/j.ijproman.2016.03.005
45 Jensen N, Wantchekon L (2004). Resource wealth and political regimes in Africa. Comparative Political Studies, 37(7): 816–841
https://doi.org/10.1177/0010414004266867
46 Jorre J D S (1972). The Nigerian Civil War. London: Hodder and Stoughton Ltd
47 Kamara J M, Anumba C J, Evbuomwan N F O (2002). Capturing Client Requirements in Construction Projects. London: Thomas Telford Publishing
48 Kellert S H (1994). In the Wake of Chaos: Unpredictable Order in Dynamical Systems. Chicago: University of Chicago press
49 Killick D (2004). What do we know about African iron working? Journal of African Archaeology, 2(1): 97–112
50 Kometa S T, Olomolaiye P O, Harris F C (1995). An evaluation of clients’ needs and responsibilities in the construction process. Engineering, Construction, and Architectural Management, 2(1): 57–76
https://doi.org/10.1108/eb021003
51 Lenfle S (2011). The strategy of parallel approaches in projects with unforeseeable uncertainty: The Manhattan case in retrospect. International Journal of Project Management, 29(4): 359–373
https://doi.org/10.1016/j.ijproman.2011.02.001
52 Love P E D, Simpson I, Smith J, Regan M, Olatunji O A (2015). Understanding the landscape of overruns in transport infrastructure projects. Environment & Planning B, 42(3): 490–509
https://doi.org/10.1068/b130102p
53 Love P E D, Smith J (2016). Toward error management in construction: Moving beyond a zero vision. Journal of Construction Engineering and Management, 142 (11): 04016058
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001170
54 Lundin R, Soderholm A (1995). A theory of the temporary organization. Scandinavian Journal of Management, 11(4): 437–455
https://doi.org/10.1016/0956-5221(95)00036-U
55 Manning C, Fruehan R (2001). Emerging technologies for iron and steelmaking. Journal of Materials, 53: 36–43
56 Markus M L, Tanis C (2000). The enterprise systems experience€—€from adoption to success. Framing the Domains of IT Research: Glimpsing the Future through the Past, 173: 207–173
57 Matusevich M (2003). No Easy Row for a Russian Hoe: Ideology and Pragmatism in Nigerian-Soviet Relations, 1960–1991. Trenton: Africa World Press
58 McGregor D (1960). The Human Side of Enterprise. New York: McGraw Hill
59 Mohammad-Hasanzadeh S, Hosseinalipour M, Hafezi M (2014). Collaborative procurement in construction projects performance measures, case study: Partnering in Iranian construction industry. Procedia: Social and Behavioral Sciences, 119: 811–818
https://doi.org/10.1016/j.sbspro.2014.03.091
60 Murphy P (1996). Chaos theory as a model for managing issues and crises. Public Relations Review, 22(2): 95–113
https://doi.org/10.1016/S0363-8111(96)90001-6
61 Murray P (2003). The Saga of Sydney Opera House: The Dramatic Story of the Design and Construction of the Icon of Modern Australia. London: Routledge
62 Naoum S, Egbu C (2015). Critical review of procurement method research in construction journals. Procedia Economics and Finance, 21: 6–13
https://doi.org/10.1016/S2212-5671(15)00144-6
63 Norem J K (2001). Optimism and Pessimism: Implications for Theory, Research, and Practice. Washington, D.C.: American Psychological Association
64 Ogunlana S O (2010). Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. International Journal of Project Management, 28(3): 228–236
https://doi.org/10.1016/j.ijproman.2009.05.005
65 Olaniran O J, Love P E D, Edwards D, Olatunji O A, Matthews J (2015). Cost overruns in hydrocarbon megaprojects: A critical review and implications for research. Project Management Journal, 46(6): 126–138
https://doi.org/10.1002/pmj.21556
66 Olaniran O J, Love P E D, Edwards D J, Olatunji O, Matthews J (2017). Chaos theory: Implications for cost overrun research in hydrocarbon megaprojects. Journal of Construction Engineering and Management, 143(2): 05016020
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001227
67 Olatunji O A, Ajayi S O (2017). Rurality, Nigeria’s massification policy on access to basic education and turnover causations amongst teachers. Australian and International Journal of Rural Education, 26: 3–17
68 Oyeyinka O, Adeloye O (1988). Technological change and project execution: Evolution of Ajaokuta Steel Plant in Nigeria. International Development Research Centre, Canada
69 Packendorff J (1995). Inquiring into the temporary organization: New directions for project management research. Scandinavian Journal of Management, 11(4): 319–333
https://doi.org/10.1016/0956-5221(95)00018-Q
70 Pich M T, Loch C H, Meyer A D (2002). On uncertainty, ambiguity, and complexity in project management. Management Science, 48(8): 1008–1023
https://doi.org/10.1287/mnsc.48.8.1008.163
71 Pinto J K, Mantel S J (1990). The causes of project failure. IEEE Transactions on Engineering Management, 37(4): 269–276
https://doi.org/10.1109/17.62322
72 Pinto J K, Slevin D P (1988). Project Success: Definitions and Measurement Techniques. Newtown Square: Project Management Institute
73 Priemus H (2010). Mega-projects: Dealing with pitfalls. European Planning Studies, 18(7): 1023–1039
https://doi.org/10.1080/09654311003744159
74 Pryor R G L, Bright J E H (2007). Applying chaos theory to careers: Attraction and attractors. Journal of Vocational Behavior, 71(3): 375–400
https://doi.org/10.1016/j.jvb.2007.05.002
75 Rausch E, Barber E, Warn J (2005). Leadership in project management: From firefighter to firelighter. Management Decision, 43(7/8): 1032–1039
https://doi.org/10.1108/00251740510610026
76 Reichl L E (2004). The Transition to Chaos. Berlin: Springer
77 Reigeluth C M (2004). Chaos theory and the sciences of complexity: Foundations for transforming education. In: Proceedings of Annual Meeting of the American Educational Research Association. San Diego
78 Relle B, Gilge C (2013). How to successfully manage your mega-project.
79 Robertson R, Combs A (2014). Chaos Theory in Psychology and the Life Sciences. London: Psychology Press
80 Schuldberg D (2011). In: Runco M A, Pritzker S R, eds. Encyclopedia of Creativity. San Diego: Academic Press
81 Sellnow T L, Seeger M W, Ulmer R R (2002). Chaos theory, informational needs, and natural disasters. Journal of Applied Communication Research, 30(4): 269–292
https://doi.org/10.1080/00909880216599
82 Shafritz J, Ott J, Jang Y (2015). Classics of Organization Theory. Boston: Cengage Learning
83 Shenhar A J, Dvir D (2007). Project management research€—€the challenge and opportunity. Project Management Journal, 38(2): 93–99
https://doi.org/10.1177/875697280703800210
84 Shepherd D A, Patzelt H, Wolfe M (2011). Moving forward from project failure: Negative emotions, affective commitment, and learning from the experience. Academy of Management Journal, 54(6): 1229– 1259
https://doi.org/10.5465/amj.2010.0102
85 Smith J, Love P E D (2004). Stakeholder management during project inception: Strategic needs analysis. Journal of Architectural Engineering, 10(1): 22–33
https://doi.org/10.1061/(ASCE)1076-0431(2004)10:1(22)
86 Smith W K, Lewis M W (2011). Toward a theory of paradox: A dynamic equilibrium model of organizing. Academy of Management Review, 36: 381–403
87 Spencer S M, Norem J K (1996). Reflection and distraction defensive pessimism, strategic optimism, and performance. Personality and Social Psychology Bulletin, 22(4): 354–365
https://doi.org/10.1177/0146167296224003
88 Tannenbaum R, Schmidt W (1958). How to choose a leadership pattern. Harvard Business Review, 36: 95–101
89 Turner J R (2008). Handbook of Project-based Management. New York: McGraw-Hill Professional Publishing
90 Walker D H (1995). An investigation into construction time performance. Construction Management and Economics, 13(3): 263– 274
https://doi.org/10.1080/01446199500000030
91 Williams P H (1964). The industrialization of nigeria. In: Proceedings of the Oklahoma Academy of Science: Geography. 215–218
92 Xenophon (1869). The Anabasis or Expedition of Cyrus and the Memorabilia of Socrates. New York: Karper and Row
93 Xie Y, Zilberman D (2014). The economics of water project capacities and conservation technologies. In: Proceedings of Agricultural and Applied Economics Association 2014 Annual Meeting
94 Zervas T, McMullan J T, Williams B C (1996). Developments in iron and steel making. International Journal of Energy Research, 20(1): 69–91
https://doi.org/10.1002/(SICI)1099-114X(199601)20:1<69::AID-ER241>3.0.CO;2-3
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed