Please wait a minute...
Frontiers of Mechanical Engineering

ISSN 2095-0233

ISSN 2095-0241(Online)

CN 11-5984/TH

Postal Subscription Code 80-975

2018 Impact Factor: 0.989

Front. Mech. Eng.    2010, Vol. 5 Issue (2) : 157-164    https://doi.org/10.1007/s11465-010-0017-x
Research articles
Selecting and prioritizing key factors for CAD/CAM software in small- and medium-sized enterprises using AHP
Ghulam ZAKRIA,Zailin GUAN,Yasser RIAZ,Mirza JAHANZAIB,Anwar KHAN,
State Key Lab of Digital Manufacturing Equipment and Technology, School of Mechanical Science and Engineering, Huazhong University of Science & Technology, Wuhan 430074, China;
 Download: PDF(161 KB)  
 Export: BibTeX | EndNote | Reference Manager | ProCite | RefWorks
Abstract In today’s fast-paced world, computer-aided design/computer-aided manufacturing (CAD/CAM) systems have become a necessary element in manufacturing industries. Prior to investment in a CAD/CAM system, it is essential for investor to know how to maximize their benefits from buying a new or by changing an existing CAD/CAM system. The purpose of this study is to provide a methodology to assist small- and medium-sized manufacturing companies of Pakistan in selecting a CAD/CAM system. It will also facilitate the software providers in recognizing the current state of affairs as well as preceding problems regarding the application of CAD/CAM in manufacturing firms when assisting them in choosing the direction for future development simultaneously. To accomplish this purpose, data have been collected about current CAD/CAM systems. Important criteria for system selection and parameters for evaluation have also been identified and prioritized. Analytic hierarchy process (AHP) is used as a decision-making technique for identifying and prioritizing important factors for CAD/CAM software selection. Expert Choice (AHP-based software) has been used to validate the results.
Keywords computer-aided design (CAD)      computer-aided manufacturing(CAM)      SMEs      analytical hierarchal approach      Expert Choice      
Issue Date: 05 June 2010
 Cite this article:   
Ghulam ZAKRIA,Zailin GUAN,Yasser RIAZ, et al. Selecting and prioritizing key factors for CAD/CAM software in small- and medium-sized enterprises using AHP[J]. Front. Mech. Eng., 2010, 5(2): 157-164.
 URL:  
https://academic.hep.com.cn/fme/EN/10.1007/s11465-010-0017-x
https://academic.hep.com.cn/fme/EN/Y2010/V5/I2/157
Marr B, Neely A. Automating the balance score card-selection criteria to identify appropriatesoftware application: measuring business excellence, centre for businessexcellence. Cranfield School of BusinessManagement, Cranfield, 2003, 7(3): 29–36
Mercer T. CAD/CAM for industry. . Graduate College University of Wisconsin, 2000
Teicholz E. CAD/CAM Hand Book Designing with Systems Series. New York: McGraw Hill, 1985
Gupta A K, Sahay B S. Development of software selection criteria for supply chain solutions. Industrial Management & Data system, 2003, 103(2): 97–110

doi: 10.1108/02635570310463429
Hokey M. Selection of software: the analytic hierarchy process. International Journal of Physical distributionand logistics Management, 1992, 22(1): 42–53

doi: 10.1108/09600039210010388
Braglia M, Carminani G, Frosolini M. AHP-based evaluation of CMMSsoftware. Journal of manufacturing technologymanagement, 2006, 17(5): 585–602

doi: 10.1108/17410380610668531
Bernroider E, Koch S. ERP selection process in mid size and large organizations. Business Process Management Journal, 2001, 7(3): 18–24

doi: 10.1108/14637150110392746
Abdi M R. Selection of lay out configuration for reconfigurablemanufacturing system using the AHP. ISAHP, Honolulu, 2005
Oeltjenbruns H, William J K, Ralf S K. Strategic planning in manufacturingsystem: AHP application to an equipment replacement decision. International Journal of production economics, 1995, 38: 189–197

doi: 10.1016/0925-5273(94)00092-O
Gibney R, Shang J. Decision making in academia: a dean selection process. Mathematical and Computer Modeling, 2007, 46: 1030–1040

doi: 10.1016/j.mcm.2007.03.024
Ketcham A F, Hoffman D. Personnel evaluation with AHP. Management Decisions, 1998, 36(10): 679–685

doi: 10.1108/00251749810245336
Azhar T, Leung L. A multi attribute product life cycle approach to replacement decision: an applicationof Satty’s system with feedback method. Eng Economist, 1993, 38: 321–344

doi: 10.1080/00137919308903107
Abdi, Labib A W. A design strategy for reconfigurable manufacturing system (RMSs) using theanalytical hierarchical process (AHP). International journal of Production Research, 2003, 41(10): 2273–2299

doi: 10.1080/0020754031000077266
Davis L, Williams G. Evaluating and selecting simulation software using the AHP. Integrated Manufacturing System, 1994, 5(1): 23–32

doi: 10.1108/09576069410050314
Saaty T L. The Analytic Hierarchy Process, Planning, Priority Setting,Resource Allocation. New York: McGraw-Hill, 1980
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed