|
|
Selecting and prioritizing key factors for CAD/CAM
software in small- and medium-sized enterprises using AHP |
Ghulam ZAKRIA,Zailin GUAN,Yasser RIAZ,Mirza JAHANZAIB,Anwar KHAN, |
State Key Lab of Digital
Manufacturing Equipment and Technology, School of Mechanical Science
and Engineering, Huazhong University of Science & Technology,
Wuhan 430074, China; |
|
|
Abstract In today’s fast-paced world, computer-aided design/computer-aided manufacturing (CAD/CAM) systems have become a necessary element in manufacturing industries. Prior to investment in a CAD/CAM system, it is essential for investor to know how to maximize their benefits from buying a new or by changing an existing CAD/CAM system. The purpose of this study is to provide a methodology to assist small- and medium-sized manufacturing companies of Pakistan in selecting a CAD/CAM system. It will also facilitate the software providers in recognizing the current state of affairs as well as preceding problems regarding the application of CAD/CAM in manufacturing firms when assisting them in choosing the direction for future development simultaneously. To accomplish this purpose, data have been collected about current CAD/CAM systems. Important criteria for system selection and parameters for evaluation have also been identified and prioritized. Analytic hierarchy process (AHP) is used as a decision-making technique for identifying and prioritizing important factors for CAD/CAM software selection. Expert Choice (AHP-based software) has been used to validate the results.
|
Keywords
computer-aided design (CAD)
computer-aided manufacturing(CAM)
SMEs
analytical hierarchal approach
Expert Choice
|
Issue Date: 05 June 2010
|
|
|
Marr B, Neely A. Automating the balance score card-selection criteria to identify appropriatesoftware application: measuring business excellence, centre for businessexcellence. Cranfield School of BusinessManagement, Cranfield, 2003, 7(3): 29–36
|
|
Mercer T. CAD/CAM for industry. . Graduate College University of Wisconsin, 2000
|
|
Teicholz E. CAD/CAM Hand Book Designing with Systems Series. New York: McGraw Hill, 1985
|
|
Gupta A K, Sahay B S. Development of software selection criteria for supply chain solutions. Industrial Management & Data system, 2003, 103(2): 97–110
doi: 10.1108/02635570310463429
|
|
Hokey M. Selection of software: the analytic hierarchy process. International Journal of Physical distributionand logistics Management, 1992, 22(1): 42–53
doi: 10.1108/09600039210010388
|
|
Braglia M, Carminani G, Frosolini M. AHP-based evaluation of CMMSsoftware. Journal of manufacturing technologymanagement, 2006, 17(5): 585–602
doi: 10.1108/17410380610668531
|
|
Bernroider E, Koch S. ERP selection process in mid size and large organizations. Business Process Management Journal, 2001, 7(3): 18–24
doi: 10.1108/14637150110392746
|
|
Abdi M R. Selection of lay out configuration for reconfigurablemanufacturing system using the AHP. ISAHP, Honolulu, 2005
|
|
Oeltjenbruns H, William J K, Ralf S K. Strategic planning in manufacturingsystem: AHP application to an equipment replacement decision. International Journal of production economics, 1995, 38: 189–197
doi: 10.1016/0925-5273(94)00092-O
|
|
Gibney R, Shang J. Decision making in academia: a dean selection process. Mathematical and Computer Modeling, 2007, 46: 1030–1040
doi: 10.1016/j.mcm.2007.03.024
|
|
Ketcham A F, Hoffman D. Personnel evaluation with AHP. Management Decisions, 1998, 36(10): 679–685
doi: 10.1108/00251749810245336
|
|
Azhar T, Leung L. A multi attribute product life cycle approach to replacement decision: an applicationof Satty’s system with feedback method. Eng Economist, 1993, 38: 321–344
doi: 10.1080/00137919308903107
|
|
Abdi, Labib A W. A design strategy for reconfigurable manufacturing system (RMSs) using theanalytical hierarchical process (AHP). International journal of Production Research, 2003, 41(10): 2273–2299
doi: 10.1080/0020754031000077266
|
|
Davis L, Williams G. Evaluating and selecting simulation software using the AHP. Integrated Manufacturing System, 1994, 5(1): 23–32
doi: 10.1108/09576069410050314
|
|
Saaty T L. The Analytic Hierarchy Process, Planning, Priority Setting,Resource Allocation. New York: McGraw-Hill, 1980
|
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|