Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland
Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland
M. WIELAND1(), G.F. KIRCHEN2
1. Poyry Energy Ltd., Hardturmstrasse 161, Zurich CH-8037, Switzerland; 2. Engadiner Kraftwerke AG, Zernez CH-7530, Switzerland
 全文: PDF(1373 KB)   HTML
Abstract

The 130 m high Punt dal Gall dam is located at the Swiss-Italian border in the South-eastern part of Switzerland and was completed in 1969. The dam is founded on highly folded and partially crushed dolomite and limestone formations. A grout curtain with an area of 120,000 m2 was provided for controlling seepage. For the monitoring of the dam deformations five inverted pendulums were installed in the dam and three in the rock foundation of the right abutment outside of the dam. For a seasonal water level fluctuation in the reservoir of about 60 m the maximum amplitude of the radial displacement is 25 mm, which includes both the effects of the water load and temperature effects. Furthermore a comprehensive geodetic network was established, 57 joint meters were installed and cracks in the crest gallery are monitored by crack meters. There are also thermometers, piezometers and rocmeters. Springs at the left and right banks of the dam are monitored and chemical analyses of the seepage water and springs are performed regularly. The dam is equipped with strong motion instruments and several near-field earthquakes have been recorded in the past. The paper describes the long-term safety monitoring of this 42 years old arch dam. A short description of the Swiss practice in dam safety monitoring and emergency planning is also given.

Key wordsdam safety concept    arch dam    dam instrumentation    dam safety monitoring
收稿日期: 2011-11-10      出版日期: 2012-03-05
Corresponding Author(s): WIELAND M.,Email:martin.wieland@poyry.com   
 引用本文:   
. Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland[J]. Frontiers of Structural and Civil Engineering, 2012, 6(1): 76-83.
M. WIELAND, G.F. KIRCHEN. Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland. Front Struc Civil Eng, 2012, 6(1): 76-83.
 链接本文:  
https://academic.hep.com.cn/fsce/CN/10.1007/s11709-012-0144-z
https://academic.hep.com.cn/fsce/CN/Y2012/V6/I1/76
Fig.1  
Fig.2  
Fig.3  
Fig.4  
Fig.5  
Fig.6  
Fig.7  
Fig.8  
Fig.9  
Fig.10  
Fig.11  
1 Gilg B. Punt dal Gall Arch Dam, Swiss Dam Technique, Swiss Association for Water Economy, Publication No. 42, Baden, Switzerland, 1970
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed