Adamiecki K (1931). Harmonygraph. Przeglad Organizacji (Organizational Review)
|
| 2 |
Ball N (2016). St. Michael – identifying the mysterious ship from 1669. , 2018–1–25
|
| 3 |
CIOB (2008). Managing the risk of delayed completion in the 21st century. Bracknell: Chartered Institute of Building
|
| 4 |
Clark W (1923). The Gantt Chart, A Working Tool for Management.New York: The Ronald Press Company
|
| 5 |
Dantzig G B (1949). Programming in a linear structure. Econometrica, 17: 73–74
|
| 6 |
Dauben J (2018). Early applications of linear perspective., 2018–1–25
|
| 7 |
Edwards I E S (1993). The Pyramids of Egypt. Baltimore: Penguine Books
|
| 8 |
Fondahl J W (1961). A non-computer approach to the critical path method for the construction industry. Stanford: Stanford University
|
| 9 |
Fondahl J W (1987). The history of modern project management. Precedence diagramming methods: origins and early development. Project Management Journal, 18(2): 33–36
|
| 10 |
Geraldi J, Lechter T (2012). Gantt charts revisited: A critical analysis of its roots and implications to the management of projects today. International Journal of Managing Projects in Business, 5(4): 578–594
https://doi.org/10.1108/17538371211268889
|
| 11 |
Gilbreth F B, Gilbreth L M (1921). Process Charts: First Steps in Finding the One Best Way to do Work. New York: The American Society of Mechanical Engineers
|
| 12 |
Ifrah G (2000). The Universal History of Numbers. New York: John Wiley & Sones Inc
|
| 13 |
Kelley J E (1957). Computers and operations research in road building. In: Proceedings of the Conference on Operations Research, Computers, and Management Decisions. Cleveland: Case Institute of Technology, 58–63
|
| 14 |
Kelley J E, Walker M R (1989). The origins of CPM – A personal history. PM Network, III(2): 7–22
|
| 15 |
Kozak-Holland M (2011). The History of Project Management. Oshawa: Multi-Media Publications Inc
|
| 16 |
Malcolm D G, Roseboom J H, Clark C E, Fazar W (1959). Application of a technique for research and development program evaluation. Operations Reserach, 7(5): 646–669.
|
| 17 |
Mansfield D F, Wildberger N J (2017). Plimpton 322 is Babylonian exact sexagesimal trigonometry. Historia Mathematica, 44(4): 395–419
https://doi.org/10.1016/j.hm.2017.08.001
|
| 18 |
Marsh E R (1976). The harmonogram: an overlooked method of scheduling work. Project Management Quarterly, 7(1): 21–25
|
| 19 |
Moder J J, Phillips C R, Davis E W (1983). Project Management with CPM, PERT and Precedence Diagramming, 3rd ed. New York: van Nostrand Reinhold Company Inc
|
| 20 |
Monge G (1798). Descriptive Geometry. Paris: Baudouin
|
| 21 |
Operational Research Society (2018). History of O.R. , 2018–1–25
|
| 22 |
Peters T F (1996). Building the Nineteenth Century. Cambridge: The MIT Press
|
| 23 |
Priestly J (1777a). A Description of a Chart of Biography (4th ed).London: J. Johnson
|
| 24 |
Priestly J (1777b). A Description of a New Chart of History, 4th ed. London: J. Johnson
|
| 25 |
Royal Museums Greenwich (2018). The world‘s largest ship model collection., 2018–1–25
|
| 26 |
Schürch H, Züblin E (1915). The construction of the valley crossing at langwies for the electric railway Chur-Arosa. Reinforced Concrete, 229–238 (in German)
|
| 27 |
Sheps A (1999). Joseph Priestley’s time charts: The use and teaching of history by rational dissent in late Eighteenth-Century England. Érudit, 18: 135–154
|
| 28 |
Smith C B (2004). How the Great Pyramid was Built. New York: HarperCollins Publishers
|
| 29 |
St Paul’s Cathedral (2018). The Great Model. , 2018–1–25
|
| 29 |
Tufte E R (1983). The Visual Display of Quantitative Information.Cheshire: Graphics Press
|
| 30 |
Weaver P (2006). A brief history of scheduling – Back to the future. In: Proceedings of myPrimavera Conference. Canberra
|
| 31 |
Weaver P (2007). The origins of modern project management. In: Proceedings of Fourth Annual PMI College of Scheduling Conference. Vancouver
|
| 32 |
Weaver P (2012). Henry L Gantt, 1861–1919 – A retrospective view of his work. PM World Journal, I(V)
|
| 33 |
Weaver P (2013). Where did the misuse of the names Gantt and PERT originate? PM World Journal, II(IV)
|
| 34 |
Weaver P (2014a). The origins of bar charting. PM World Journal, III(III)
|
| 35 |
Weaver P (2014b). Project governance & control – The building of the crystal palace. PM World Journal, III(IV)
|
| 36 |
Weaver P (2014c). The origins of the Coordinated Universal Time (UTC) calendar. PM World Journal, III(VII)
|
| 37 |
Weaver P (2017). Projects controls using integrated data. In: Proceedings of the PMI Virtual Scheduling Conference 2017
|
| 38 |
Willis C, Friedman D (1998). Building the Empire State Building. New York: W.W. Norton and Company
|