Please wait a minute...
Frontiers of Engineering Management

ISSN 2095-7513

ISSN 2096-0255(Online)

CN 10-1205/N

Postal Subscription Code 80-905

Front. Eng    2016, Vol. 3 Issue (1) : 74-79    https://doi.org/10.15302/J-FEM-2016013
Engineering Management Reports
Practice and Experience of Canton Tower Project Management
Rong-hua Yi()
Guangzhou Construction Engineering Supervision Co., Ltd., Guangzhou 510030, China
 Download: PDF(89 KB)   HTML
 Export: BibTeX | EndNote | Reference Manager | ProCite | RefWorks
Abstract

This paper presents a brief introduction about the preliminary consulting and tender agent of Canton Tower, the basic situation of the whole-process supervision on the construction site, and a general summary of the Canton Tower project management. What’s more, the author suggests that some guidelines be formed for supervision enterprises involved in large-scale project management.

Keywords Canton Tower      consultation      tender agent      whole-process      supervision     
Corresponding Author(s): Rong-hua Yi   
Online First Date: 09 May 2016    Issue Date: 26 May 2016
 Cite this article:   
Rong-hua Yi. Practice and Experience of Canton Tower Project Management[J]. Front. Eng, 2016, 3(1): 74-79.
 URL:  
https://academic.hep.com.cn/fem/EN/10.15302/J-FEM-2016013
https://academic.hep.com.cn/fem/EN/Y2016/V3/I1/74
1 Chen, Y., Zhao, X., & Wang, S. (2007). Experimental research on bidirectional hinge joints in Guangzhou New TV Tower. Shanghai: College of Civil Engineering of Tongji University.
2 Gu, M., Huang, P., Zhu, L., & Pan, H. (2009). Wind tunnel force balance test and wind-induced responses of the Guangzhou New TV Tower structure I: Wind tunnel test. China Civil Engineering Journal, 42, 8–13.
3 Guo, Y., Liu, L., Wang, Y., Lin, B., Pan, H., & Liang, S. (2008). Experimental investigation on the stability of the waist portion of the Guangzhou New TV Tower. China Civil Engineering Journal, 41, 43–53.
4 Ministry of Construction of the P.R.C. (2002). Provisions on the management of the seismic fortification of the high-rise buildings.Beijing: The National Council. Retrieved from .
5 Pan, H., Zhou, F., & Liang, S. (2008). Shaking table tests for the structural model of Guangzhou New TV Tower. Journal of Engineering Mechanics, 25, 78–85.
6 Wu, S., Liang, J., & Chen, W. (2011). Your landscape scenery heaven into my arms-Canton Tower design. Journal of Architecture, ISSN 0529–1399, 1.
7 Yu, Y., Yang, H., & Zhou, D. (2010). Structural design and difficulties analysis of Guangzhou new TV Tower. Guangzhou Civil Engineering Journal, 17, 3–5.
8 Yu, Z., Chen, X., Wu, X., & Shao, Q. (2009). Application of large outside attached tower crane to Guangzhou New TV Tower and related study by actual observation. Building Construction, 31, 950–951.
9 Zhou, F. (2006). Simulated earthquake test research of the structure model of Guangzhou New TV Tower on a shaking table. Guangzhou: Earthquake Engineering Research Test Center of Guangzhou University.
10 Zhou, X., Gu, M., Zhu, L., & Huang, P. (2009). Wind tunnel force balance test and wind-induced response of the Guangzhou New TV Tower structure II: analysis of wind-induced responses. China Civil Engineering Journal, 42, 14–19.
[1] Zhen-you Li,Ji-shan He,Meng-jun Wang. Improving Internationally Core Competences Based on the Capabilities of Precise and Accurate Project Management[J]. Front. Eng, 2016, 3(3): 231-238.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed