| 1 |
ArditiD, AkanG T, GurdamarS (1985). Cost overruns in public projects.International Journal of Project Management, 3(4): 218–224
https://doi.org/10.1016/0263-7863(85)90053-5
|
| 2 |
AlaviS, TavaresM P (2009). Highway Project Cost Estimating and Management. Technical Report FHWA/MT-08-007/8189
|
| 3 |
BambergerC, StarkM (2008). Best practices for use of best value selections AGC of America & NASFA.
|
| 4 |
BeardL J, LoulakisC M, WundramC E (2001). Design-Build: Planning through Development. New York: McGraw-Hill Professional
|
| 5 |
BeemerJ (2005). The cost of perfection in public works projects: A design professional’s perspective. American Council of Engineering Companies, Government Advocacy,
|
| 6 |
BlanchardB (2007).Design-build lessons learned Florida DOT. In: Proceedings of Louisiana Transportation Engineering Conference. Baton Rouge, 6–14
|
| 7 |
BothaP S, ScheepbouwerE (2015). Christchurch rebuild, New Zealand: Alliancing with a difference. Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, 168(3): 121–129
https://doi.org/10.1680/mpal.14.00032
|
| 8 |
BubshaitA A, Al-SaidF A, AbolnourM M (1998). Design fee versus design deficiency.Journal of Architectural Engineering, 4(2): 44–46
https://doi.org/10.1061/(ASCE)1076-0431(1998)4:2(44)
|
| 9 |
BuratiJ L Jr, FarringtonJ J, LedbetterW B (1992). Causes of quality deviations in design and construction.Journal of Construction Engineering and Management, 118(1): 34–49
https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(34)
|
| 10 |
CarrP G, BeyorP S (2005). Design fees, the state of the profession, and a time for corrective action.Journal of Management Engineering, 21(3): 110–117
https://doi.org/10.1061/(ASCE)0742-597X(2005)21:3(110)
|
| 11 |
CBC News (2015). Charbonneau commission report: A deeper look at the recommendations.
|
| 12 |
CharbonneauF, LachanceR (2015). Final Report of the Commission of Inquiry on the Awarding and management of contracts public in the construction industry. (in French)
|
| 13 |
CraigieE K, GransbergD D, JeongH D (2016). Cost and scope breakdown structure for functional level estimating of consultant fees.Transportation Research Record: Journal of the Transportation Research Board, 2573: 157–163
|
| 14 |
CrossetJ, HinesL (2007). Comparing State DOTs’ Construction Project Cost and Schedule Performance: 28 BestPractices from Nine States. AASHTO, Washington
|
| 15 |
CrowleyL G, HancherD E (1995). Evaluation of competitive bids.Journal of Construction Engineering and Management, 121(2): 238–245
https://doi.org/10.1061/(ASCE)0733-9364(1995)121:2(238)
|
| 16 |
CurryB (2016). Competition Bureau warns of bid-rigging as Ottawa set to spend on infrastructure. , 2016-05-29
|
| 17 |
EllisR D, HerbsmanZ, KumarA (1991). Evaluation of the FDOT design/build program. Final Report, Submitted to Florida Deptment of Transportation, State Project No. 99700-7543-010, Department of Civil Engineering, University of Florida, Gainesville
|
| 18 |
Federal Highway Administration (FHWA) (2006). Design-build effectiveness study. , 2016-05-29
|
| 19 |
GirardD (2016). Charbonneau Commission Follow-up: Ethics Lessons for Quebec and Elsewhere. Webinar Presentation,
|
| 20 |
GransbergD D, BartonR F (2007). Analysis of federal design-build request for proposals evaluation criteria.Journal of Management Engineering, 23(2): 105–111
https://doi.org/10.1061/(ASCE)0742-597X(2007)23:2(105)
|
| 21 |
GransbergD D, BussA, KaracaI,LoulakisM C (2017). Alternate design/Alternate bid process for pavement type selection. NCHRP Synthesis Report 20-05/Topic47-02
https://doi.org/10.17226/24674
|
| 22 |
GransbergD D, EllicottM A (1997). Best value contracting criteria.Cost Engineering, 39(6): 31–34
|
| 23 |
GransbergD D, JeongH D, Lopez del PuertoC, Hunter K D (2014). Preconstruction Services Estimating Guidebook. Interim Research Report, NCHRP Project15-51
|
| 24 |
GransbergD D, Lopez del PuertoC, HumphreyD (2007). Relating cost growth from the initial estimate to design fee for transportation projects.Journal of Construction Engineering and Management, 133(6): 404–408
https://doi.org/10.1061/(ASCE)0733-9364(2007)133:6(404)
|
| 25 |
GransbergD D, MolenaarK R (2008). Does design-build project delivery affect the future of the public engineer? Transportation Research Record:Journal of the Transportation Research Board, 2081: 3–8
https://doi.org/10.3141/2081-01
|
| 26 |
HarpD W (1991). Historical background—Low bid concept. Transportation Research Circular, 386: 43–47
|
| 27 |
HigbeeJ B (2004). Geotechnical issues with large design—Build highway projects.Transportation Research Record: Journal of the Transportation Research Board, 1868: 147–153
https://doi.org/10.3141/1808-17
|
| 28 |
HokeT (2012). A question of ethics: The ethical aspects of competition.Civil Engineering Magazine Archive, 82(10): 44–45
https://doi.org/10.1061/ciegag.0000739
|
| 29 |
HunterK D, GransbergD D (2014). Comparative analysis of two models for estimating highway project design costs. Transportation Research Board Annual Meeting 2014, National Academies, Compendium, Paper 14-3967
|
| 30 |
JanacekJ (2006). Construction costs going through the roof? 2006 Public Works Officer Institute, Presentation, Los Angeles
|
| 31 |
KirbyJ G, FurryD A, HicksD K (1988). Improvements in design review management.Journal of Construction Engineering and Management, 114(1): 69–82
https://doi.org/10.1061/(ASCE)0733-9364(1988)114:1(69)
|
| 32 |
KraftE, ParkH, GransbergD D (2014). Performance bond: Cost benefit, and paradox for public highway agencies. Transportation Research Record: Journal of the Transportation Research Board, 2408: 3–9
|
| 33 |
LenzR (2010). TxDOT’s alternate pavement design and bid policy. Texas Asphalt Paving Association Annual Meeting, Presentation, Austin
|
| 34 |
Lopez del PuertoC, CraigieE, GransbergD D (2016). Construction cost certainty versus construction savings: Which is the correct approach? In: Proceedings of Transportation Research Board 95th Annual Meeting. Washington,16-2754
|
| 35 |
Lopez del PuertoC, GransbergD D, ShaneJ S (2008). Comparative analysis of owner goals for design/build projects.Journal of Management Engineering, 24(1): 32–29
https://doi.org/10.1061/(ASCE)0742-597X(2008)24:1(32)
|
| 36 |
MendezV (2010). Every day counts: Innovation initiative. Federal Highway Administration, Washington
|
| 37 |
MinchinR E, ChiniA P (2016). Alternative Contracting Research. Final Research Report, FDOT Contract Number BDV31-977-40, Florida DOT, Tallahassee
|
| 38 |
MolenaarK R, GransbergD D (2001). Design-builder selection for small highway projects.Journal of Management Engineering, 17(4): 214–223
https://doi.org/10.1061/(ASCE)0742-597X(2001)17:4(214)
|
| 39 |
MorgenE T (1986). Claims by the federal government against its A/E—Guidelines for improving practice. Office for Professional Liability, Research of Victor O. Schinner, Washington
|
| 40 |
OdeckJ (2004). Cost overruns in road construction—What are their sizes and determinants?Transport Policy, 11(1): 43–53
https://doi.org/10.1016/S0967-070X(03)00017-9
|
| 41 |
Oklahoma Turnpike Authority (OTA) (1999). Standards and Specifications, Oklahoma City
|
| 42 |
Rueda-BenavidesJ A, GransbergD D (2014). Indefinite delivery/indefinite quantity contracting: A case study analysis.Transportation Research Record, 2408: 17–25
https://doi.org/10.3141/2408-03
|
| 43 |
ScheepbouwerE, HumphriesA B (2011). Transition in adopting project delivery method with early contractor involvement.Transportation Research Record, 2228: 44–50
https://doi.org/10.3141/2228-06
|
| 44 |
ScottS, MolenaarK R, GransbergD D, SmithN C (2006). Best Value Procurement for Highway Construction Projects. NCHRP Report Project10-61
https://doi.org/10.17226/13982
|
| 45 |
ShaneJ S, GransbergD D, MolenaarK R, GladkeJ R (2006). Legal challenge to a best-value procurement system.Leadership and Management in Engineering, 6(1): 20–25
https://doi.org/10.1061/(ASCE)1532-6748(2006)6:1(20)
|
| 46 |
SongerA D, IbbsC W, NapierT R (1994). Process model for public sector design-build planning. Journal of Construction Engineering and Management, 120(4): 857–874
https://doi.org/10.1061/(ASCE)0733-9364(1994)120:4(857)
|
| 47 |
SzeligaK R (2005). Conflict and intrigue in government contracts: A guide to identifying and mitigating organizational conflicts of interest.Public Contract Law Journal, 35(4): 639–674
|
| 48 |
TigheS (2001). Guidelines for probabilistic pavement life cycle cost analysis.Transportation Research Record, 1769: 28–38
https://doi.org/10.3141/1769-04
|
| 49 |
TranD, MolenaarK R, GransbergD D (2016). Implementing best-value procurement for design-bid-build highway projects. Transportation Research Record: Journal of the Transportation Research Board, 2573: 26–33
|
| 50 |
Van de RijtJ, SantemaS (2012). The best value approach in the Netherlands: A reflection on past, present and future.Journal for the Advancement of Performance Information and Value, 4(2): 147–160
|
| 51 |
WestN, GransbergD D, McMinimeeJ (2012). Effective tools for projects delivered using the construction manager/general contractor method.Transportation Research Record, 2268: 33–39
https://doi.org/10.3141/2268-05
|
| 52 |
YuW, WangK (2012). Best value or lowest bid? A quantitative perspective. Journal of Construction Engineering and Management, 138(1): 128–134
https://doi.org/10.1061/(ASCE)CO.1943-7862.0000414
|
| 53 |
YuanJ, ZengA, SkibniewskiM J, LiQ (2009). Selection of performance objectives and key performance indicators in public-private partnership projects to achieve value for money.Construction Management and Economics, 27(3): 253–270
https://doi.org/10.1080/01446190902748705
|