Construction engineering management culture shift: Is the lowest tender offer dead?
Eric SCHEEPBOUWER, Douglas D. GRANSBERG, Carla Lopez del PUERTO
Front. Eng. 2017, 4 (1): 49-57.
https://doi.org/10.15302/J-FEM-2017014
The procurement of public construction projects must walk a fine line between the corruption of state officials and collusion of contractors. The method of awarding projects to the lowest responsible tenderer was originally implemented to guard against corruption of state officials. However, an investigation of the construction industry in the Canadian province of Quebec showed that lowest-tender-offer procurement gave rise to collusion of companies tendering for the contracts. Alternatively, best-value procurement has been used for decades, but here problems arise owing to the necessity of subjective judging of measures other than price to compare bids, giving rise to time- and money-consuming protests. The paper proposes a compelling argument that the construction engineering management (CEM) culture should refocus its efforts on enhancing project cost certainty rather than merely searching for means to design a project in a manner that produces the lowest initial cost, and awards the construction to the lowest tender offer that focuses on cost savings during the project development and delivery process. The difference in the two approaches is subtle but extremely important. To make the transition, the engineering management tools must be advanced to the next level. This means that all project control tools for managing cost, schedule, and technical scope must be transformed from working in the deterministic mode to the stochastic mode, thus making the probability of completing the project within or below its official budget the primary decision criterion. To do so, CEMs must accept that there is a benefit in paying more for an alternative that increases cost certainty for the entire project. The authors of this paper hope that it will provide the grist for a more general dialog across all industry sectors where engineering management is practiced.
Figures and Tables |
References |
Related Articles |
Metrics
|
|
The outlook of blockchain technology for construction engineering management
Jun WANG, Peng WU, Xiangyu WANG, Wenchi SHOU
Front. Eng. 2017, 4 (1): 67-75.
https://doi.org/10.15302/J-FEM-2017006
Current construction engineering management suffers numerous challenges in terms of the trust, information sharing, and process automation. Blockchain which is a decentralised transaction and data management technology, has attracted increasing interests from both academic and industrial aspects since 2008. However, most of the existing research and practices are focused on the blockchain itself (i.e. technical challenges and limitations) or its applications in the finance service sector (i.e. Bitcoin). This paper aims to investigate the potential of applying blockchain technology in the construction sector. Three types of blockchain-enabled applications are proposed to improve the current processes of contract management, supply chain management, and equipment leasing, respectively. Challenges of blockchain implementation are also discussed in this paper.
Figures and Tables |
References |
Related Articles |
Metrics
|
|
Web-based construction equipment fleet management system: cost-effective global and local allocation
Hakob AVETISYAN, Miroslaw SKIBNIEWSKI
Front. Eng. 2017, 4 (1): 76-83.
https://doi.org/10.15302/J-FEM-2017012
Over the last two decades, construction contractors have been gradually making more investments in construction equipment to meet their needs associated with increasing volumes of construction projects. At present, from an operational perspective, almost all contractors pay more attention to maintaining their equipment fleets in well-sustained workable conditions and having a high accessibility of the necessary equipment pieces. However, such an approach alone is not enough to maintain an efficient and sustainable business. In particular, for large-scale construction companies that operate in multiple sites in the U.S. or overseas, the problem extends to an optimal allocation of available equipment. Given the current state of the construction industry in the U.S., this problem can be solved by geographically locating equipment pieces and then wisely re-allocating them among projects. Identifying equipment pieces geographically is a relatively easy task. The difficulty arises when informed decision-making is required for equipment allocation among job sites. The actual allocation of equipment should be both economically feasible and technologically preferable. To help in informed decision-making, an optimization model is developed as a mixed integer program. This model is formed based on a previously successfully developed decision-support model for construction equipment selection. The proposed model incorporates logical strategies of supply chain management to optimally select construction equipment for any construction site while taking into account the costs, availability, and transportation-related issues as constraints. The model benefits those responsible for informed decision-making for construction equipment selection and allocation. It also benefits the owners of construction companies, owing to its cost-minimization objective.
Figures and Tables |
References |
Related Articles |
Metrics
|
|
Motion-based analysis for construction workers using biomechanical methods
Xincong YANG, Yantao YU, Heng LI, Xiaochun LUO, Fenglai WANG
Front. Eng. 2017, 4 (1): 84-91.
https://doi.org/10.15302/J-FEM-2017004
Sustaining awkward postures and overexertion are common factors in construction industry that result in work-related injuries of workers. To address there safety and health issues, conventional observational methods on the external causes are tedious and subjective, while the direct measurement on the internal causes is intrusive leading to productivity reduction. Therefore, it is essential to construct an effective approach that maps the external and internal causes to realize the non-intrusive identification of safety and health risks. This research proposes a theoretical method to analyze the postures tracked by videos with biomechanical models. Through the biomechanical skeleton representation of human body, the workload and joint torques are rapidly and accurately evaluated based on the rotation angles of joints. The method is then demonstrated by two case studies about (1) plastering and (2) carrying. The experiment results illustrate the changing intramuscular torques across the construction activities in essence, validating the proposed approach to be effective in theory.
Figures and Tables |
References |
Related Articles |
Metrics
|
|
Achieving energy efficiency in government buildings through mandatory policy and program enforcement
Patrick X.W. ZOU, Morshed ALAM, Van Manh PHUNG, Dipika WAGLE, Rodney STEWART, Edoardo BERTONE, Oz SAHIN, Chris BUNTINE
Front. Eng. 2017, 4 (1): 92-103.
https://doi.org/10.15302/J-FEM-2017101
Government buildings are responsible for a significant proportion of energy consumption worldwide, for example, in Australia, up to 41.5 PJ energy was consumed by government buildings in 2011–2012. While the newly constructed buildings may be energy efficient, the existing buildings, which account for more than 85% of the total building stock, were built prior to the time when energy rating systems was put in practice and are consequently energy inefficient to a large degree. Reducing the energy consumption in existing government buildings is essential, as it will not only reduce the costs and environmental impacts, but also show governments’ strong commitment towards the reduction of greenhouse gas emission. Furthermore, successful building energy retrofit projects are the showcases to the general public, encouraging other sectors (e.g. commercial) to conduct building retrofits for energy savings. Recognising these benefits, several state governments in Australia have introduced building energy efficiency policies and programs. This paper reviewed the energy efficiency policies/programs in five States in Australia: Victoria, New South Wales, South Australia, Western Australia, and Queensland in terms of respective policies and targets, implementation methods and current progress. The lessons learned from these programs were also discussed. This research revealed that the key factors for a successful government building energy retrofitting program are 1) having a properly enforced energy efficiency mandate with clear energy saving targets, 2) establishing an expert facilitation team and 3) implementing suitable financing and procurement methods.
Figures and Tables |
References |
Related Articles |
Metrics
|
14 articles
|