Please wait a minute...
Frontiers of Engineering Management

ISSN 2095-7513

ISSN 2096-0255(Online)

CN 10-1205/N

Postal Subscription Code 80-905

Front. Eng    2015, Vol. 2 Issue (2) : 154-158    https://doi.org/10.15302/J-FEM-2015028
ENGINEERING MANAGEMENT THEORIES AND METHODOLOGIES
Research on Emergency Management System for Military Engineering Projects
Mao-guang Lin1,Qian-kun Wang2,*()
1. Guangzhou Military Air Force Engineering Construction Bureau, Guangzhou 510405, China
2. Wuhan University of Technology, Wuhan 430070, China
 Download: PDF(67 KB)   HTML
 Export: BibTeX | EndNote | Reference Manager | ProCite | RefWorks
Abstract

Emergency management systems for military engineering projects have been established to enhance the capacities of wartime logistics and emergency logistical support. This study focuses on the combat characteristics of the warfare information system and based on analysis of emergency response for military combat systems, utilizes the concept of systematic combat and comprehensive integrated approach to investigate management of military engineering projects. Also, a basic mode for emergency management of military engineering projects based on the concept of “pre-war intelligent engineering on demand, wartime early engagement warning and monitoring, post-war emergency repair and rescue” and “strategic, comprehensive, integrated response” is proposed.

Keywords military engineering projects      emergency management      system     
Corresponding Author(s): Qian-kun Wang   
Online First Date: 13 October 2015    Issue Date: 12 November 2015
 Cite this article:   
Mao-guang Lin,Qian-kun Wang. Research on Emergency Management System for Military Engineering Projects[J]. Front. Eng, 2015, 2(2): 154-158.
 URL:  
https://academic.hep.com.cn/fem/EN/10.15302/J-FEM-2015028
https://academic.hep.com.cn/fem/EN/Y2015/V2/I2/154
[1] Pengfei ZHANG, Samuel T. ARIARATNAM. Life cycle cost savings analysis on traditional drainage systems from low impact development strategies[J]. Front. Eng, 2021, 8(1): 88-97.
[2] Chinemelu J. ANUMBA, Abiola AKANMU, Xiao YUAN, Congwen KAN. Cyber–physical systems development for construction applications[J]. Front. Eng, 2021, 8(1): 72-87.
[3] Yan ZHANG, His-Hsien WEI, Dong ZHAO, Yilong HAN, Jiayu CHEN. Understanding innovation diffusion and adoption strategies in megaproject networks through a fuzzy system dynamic model[J]. Front. Eng, 2021, 8(1): 32-47.
[4] Xiaoxiao XU, Patrick X. W. ZOU. System dynamics analytical modeling approach for construction project management research: A critical review and future directions[J]. Front. Eng, 2021, 8(1): 17-31.
[5] Hongfeng CHAI, Quan SUN, Yu ZHOU, Tao ZHU. Design of a digital currency information system based on the UnionPay network[J]. Front. Eng, 2020, 7(4): 471-484.
[6] Jin CHEN, Ximing YIN, Jizhen LI. Firm innovation system: Paths for enhancing corporate indigenous innovation capability[J]. Front. Eng, 2020, 7(3): 404-412.
[7] Roshan POUDEL, Borja GARCIA de SOTO, Eder MARTINEZ. Last Planner System and Scrum: Comparative analysis and suggestions for adjustments[J]. Front. Eng, 2020, 7(3): 359-372.
[8] Shubin SI, Jiangbin ZHAO, Zhiqiang CAI, Hongyan DUI. Recent advances in system reliability optimization driven by importance measures[J]. Front. Eng, 2020, 7(3): 335-358.
[9] Yongfu SUN. “Heavenly Road”: The Qinghai–Tibet Railway[J]. Front. Eng, 2020, 7(2): 304-307.
[10] Qingxian AN, Xuyang LIU, Shijie DING. Efficiency measurement for mixed two-stage nonhomogeneous network processes with shared extra intermediate resources[J]. Front. Eng, 2020, 7(2): 259-274.
[11] Zachary A. COLLIER, James H. LAMBERT. Managing obsolescence of embedded hardware and software in secure and trusted systems[J]. Front. Eng, 2020, 7(2): 172-181.
[12] Alessandro CARBONARI, Leonardo MESSI, Berardo NATICCHIA, Massimo VACCARINI, Massimiliano PIRANI. Development of a BIM-based holonic system for real-time monitoring of building operational efficiency[J]. Front. Eng, 2020, 7(1): 89-103.
[13] Feng YANG, Manman WANG. A review of systematic evaluation and improvement in the big data environment[J]. Front. Eng, 2020, 7(1): 27-46.
[14] Jack Xunjie LUO. Fully automatic container terminals of Shanghai Yangshan Port phase IV[J]. Front. Eng, 2019, 6(3): 457-462.
[15] Lizzette PÉREZ LESPIER, Suzanna LONG, Tom SHOBERG, Steven CORNS. A model for the evaluation of environmental impact indicators for a sustainable maritime transportation systems[J]. Front. Eng, 2019, 6(3): 368-383.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed