Analysis of Flue Gas Pollutants Deep-removal Technology in Coal-fired Power Plants
Xiao-lu Zhang
Front. Eng. 2014, 1 (4): 336-340.
https://doi.org/10.15302/J-FEM-2014061
In recent years, frequent haze has made PM2.5 become a public hotspot. PM2.5 control has been added to the 2012 release “ambient air quality standard.” Currently flue gas pollutant control technology does not easily remove PM2.5. Developing Flue Gas Pollutant Deep-removal Technology (DRT) for coal-fired power plants for deep-removing pollutants such as PM2.5, SO2, SO3, and heavy metals, is an urgent problem. Based on the analysis of the necessity and existing problems of developing DRT suitable for China, this study focused on PM2.5 removal technology, low NOx emission of ultra supercritical boiler under all load conditions, and the adaptability of SCR working temperature. Finally, the flue gas pollutant removal system at a 2×660MW supercritical power plant was introduced, and the roadmap for developing DRT for 1,000MW ultra supercritical units was analyzed.
Figures and Tables |
References |
Related Articles |
Metrics
|
|
Building of Post-project Management
Yu Han,Yu-fei Li,Hu Cheng
Front. Eng. 2014, 1 (4): 353-357.
https://doi.org/10.15302/J-FEM-2014051
Traditional project management often ignores problems arising after project completion such as value changing, functional decline, waste of resources and environmental pollution during the operation and dismantling process. This paper advances the concept of “post-project”, builds a framework for post-project management with case analysis, as the social development and new requirements for project management by environmental protection. Post-project refers to a project which no longer possesses normal value, because of loss after use, inability to adapt to new requirements, artificial destruction, damage beyond control, and deprivation of value after the completion of the project. Post-project management encompasses a series of management and technical activities including updating, reforming, removal, recovery, and recycling. The process of post-project management is composed of classification and characteristics of post-projects, management decisions, implementation, and evaluation. Post-project management can realize the sustainable development of project and society.
Figures and Tables |
References |
Related Articles |
Metrics
|
|
Theoretical Analysis of Public Rental House Supply
Yue Teng,Bo Xu,Xiao Li,Ling Li,Xia-zhi Fang
Front. Eng. 2014, 1 (4): 372-377.
https://doi.org/10.15302/J-FEM-2014056
The public rental house (PRH) plays a significant role in our housing security system. Using the theory of public goods, both government and private enterprises have advantages and disadvantages in supplying the PRH. In order to optimize the present supply system of the PRH, this article introduces the delivery pattern of public and private partnerships (PPP) into the government allocation system, and improves it into public-intermediary-private-partnerships (PIPP), a new supply system through government, private enterprises and intermediary organization cooperation. It helps to better achieve the security role of the PRH in our society.
Figures and Tables |
References |
Related Articles |
Metrics
|
|
Industrial Structure Adjustment of Shaanxi Province under the Limited Water Resources Condition
Xiao-jun Liu,Zhen-yu Guo,Chao Ding,Han-liang Fu
Front. Eng. 2014, 1 (4): 378-384.
https://doi.org/10.15302/J-FEM-2014057
Shaanxi Province is a region poor of water resources in China, and the lack of water resources is becoming a key factor which restricts the social and economic development of Shaanxi Province. In the perspective of efficient utilization of water resources, Shaanxi Province is committed to the transformation of the economic growth and the industrial structure, and treats these measures as important guarantees for the future development of Shaanxi Province. This paper focuses on building multi-objective programming model of industrial structure optimization under the limited water resources condition, indicates the direction of the industrial transformation and water consumption structural adjustment by solving the model, and furthermore points out the key factors that affect the development of Shaanxi Province in the future. Finally, the authors give some advices of promoting the reasonable and effective utilization of water resources of Shaanxi Province.
Figures and Tables |
References |
Related Articles |
Metrics
|
|
The Effect of TRIZ on Research Institute Innovation
He Liu,Qing-hai Yang,Xu Jin
Front. Eng. 2014, 1 (4): 385-389.
https://doi.org/10.15302/J-FEM-2014059
With a background in improving independent innovation capabilities and building a world-class petroleum research institute, scientific innovation is the essence and basis of an innovative framework for a research institute, as well as the inexhaustible driving force for sustainable development. By introducing the theory of inventive problem solving (TRIZ) and combining it with CAI (computer aided innovation) technology, the Research Institute of Petroleum Exploration and Development established an adaptive innovative system by making experiments and fanning out from a point to an area gradually. This article takes the example of the innovative practices of the Department of Petroleum Equipment in Research Institute of Petroleum Exploration and Development, and introduces a building method for the innovative system based on technical innovation, enterprise culture, organizational structure, scheme, and people. It also summarizes the experiences and effects of improving innovative system upon scientific practice which can provide important guidance and reference significance for accelerating independent innovative capability.
Figures and Tables |
References |
Related Articles |
Metrics
|
|
Sustainable Supply Model Design of Public Rental Housing —Case Study of Chongqing
Xiao Li,Xiang Gu,Yue Teng,Pan Li
Front. Eng. 2014, 1 (4): 410-416.
https://doi.org/10.15302/J-FEM-2014050
Public rental housing is an important governmental project. Within the next three years, Chongqing municipal government proposes building 40×106 m2 of public rental housing to solve the housing problem for 2 million people. Many problems of sustainability have happened in long-term large-scale construction, including gradually-slow renting progress, the shortage of funds, public rental housing community facilities are retrograde, and the selected sites are at the city’s edge. This paper analyzes the Chongqing public rental housing situation from the perspective of sustainable public rental housing supply, putting forward a sustainable supply model that is suitable for Chongqing, and then calculates their portion.
Figures and Tables |
References |
Related Articles |
Metrics
|
20 articles
|