Engineering Management Reports |
|
|
|
An Intelligent Logistics Management Model in Prefabricated Construction |
Chong-guang Feng1,*(),Hao Hu2,Feng Xu2,Jian Yang2 |
1. Sino-US Global Logistics Institute, Shanghai Jiao Tong University, Shanghai 200030, China 2. School of Naval Architecture, Ocean & Civil Engineering, Shanghai Jiao Tong University, Shanghai 200240, China |
|
|
Abstract In recent years, with the increasingly complex fabricated construction environment and increasingly challenging logistics management requirements, this paper proposes a model of intelligent logistics management based on radio frequency identification and building information modeling, which enables monitoring full life cycle of building components and improving construction efficiency through real-time uploading and tracking components and materials logistics information. The empirical model was typically used in the construction of a major theme park with good results achieved.
|
Keywords
logistics management
intelligent construction
BIM
RFID
fabricated construction
major theme park
|
Corresponding Author(s):
Chong-guang Feng
|
Online First Date: 28 October 2015
Issue Date: 12 November 2015
|
|
1 |
Hu, Q. (2013). An application of RFID technology in the discrete manufacturing industry complex material distribution (Dissertation for the Master’s Degree). Qingdao: China Ocean University (in Chinese)
|
2 |
Irizarry, J., Karan, E. P., & Jalaei, F. (2013). Integrating BIM and GIS to improve the visual monitoring of construction supply chain management. Automation in Construction, 31, 241–254
https://doi.org/10.1016/j.autcon.2012.12.005
|
3 |
Li, T. (2011). Prefabricated building life cycle management application of BIM and RFID (Dissertation for the Master’s Degree). Dalian: Dalian University of Technology (in Chinese)
|
4 |
Qiao, J. (2014). RFID technology in logistics. Science and Technology Vision, 3, 5–6 (in Chinese)
|
5 |
Shi, J., Tang, J., & Zhang, K. (2014). Study on and countermeasure for development of prefabricated building of Shanghai. Housing Science and Technology, 11, 1–5 (in Chinese)
|
6 |
Su, C. (2014). RFID-based prefabricated housing components tracking management research (Dissertation for the M<?Pub Caret?>aster’s Degree). Harbin: Harbin Institute of Technology (in Chinese)
|
7 |
Suchart, N. (2003). The effects of visual-based information logistics in construction (Dissertation for the Master’s Degree). Raleigh: North Carolina State University
|
8 |
Yoon, S., & Chin, S. (2011). An RFID and BIM based simulator for construction material logistics and progress management. Korean Journal of Construction Engineering and Management, 12(5), 46–54 (in Korean)
|
|
Viewed |
|
|
|
Full text
|
|
|
|
|
Abstract
|
|
|
|
|
Cited |
|
|
|
|
|
Shared |
|
|
|
|
|
Discussed |
|
|
|
|