Frontiers of Engineering Management

ISSN 2095-7513

ISSN 2096-0255(Online)

CN 10-1205/N

Postal Subscription Code 80-905

   Online First

Administered by

30 Most Downloaded Articles
Published in last 1 year | In last 2 years| In last 3 years| All| Most Downloaded in Recent Month| Most Downloaded in Recent Year|

Most Downloaded in Recent Month
Please wait a minute...
For Selected: View Abstracts Toggle Thumbnails
Risk warning technologies and emergency response mechanisms in Sichuan–Tibet Railway construction
Liujiang KANG, Hao LI, Cong LI, Na XIAO, Huijun SUN, Nsabimana BUHIGIRO
Front. Eng    2021, 8 (4): 582-594.   https://doi.org/10.1007/s42524-021-0151-7
Abstract   HTML   PDF (20075KB)

Safety is one of the most critical themes in any large-scale railway construction project. Recognizing the importance of safety in railway engineering, practitioners and researchers have proposed various standards and procedures to ensure safety in construction activities. In this study, we first review four critical research areas of risk warning technologies and emergency response mechanisms in railway construction, namely, (i) risk identification methods of large-scale railway construction projects, (ii) risk management of large-scale railway construction, (iii) emergency response planning and management, and (iv) emergency response and rescue mechanisms. After reviewing the existing studies, we present four corresponding research areas and recommendations on the Sichuan–Tibet Railway construction. This study aims to inject new significant theoretical elements into the decision-making process and construction of this railway project in China.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(11)
Optimal risk allocation in alliance infrastructure projects: A social preference perspective
Xiang DING, Qian LI
Front. Eng    2022, 9 (2): 326-336.   https://doi.org/10.1007/s42524-020-0145-x
Abstract   HTML   PDF (373KB)

The mechanism of risk allocation is designed to protect all stakeholders, and it is vital to project success. Qualitative and quantitative ways of optimizing risk allocation have been well documented in extant literature (e.g., allocation principles, models, and solutions), and the foci of existing research are usually the maximization of rational utility. Few research has focused on partners’ social preferences affecting the output of risk allocation. This study presents a quantitative approach based on modeling alliance member (AM)’s inequity aversion (IA) to analyze risk-sharing arrangements in an alliance project. Fehr and Schmidt’s inequity-aversion model is integrated into modeling partner’s utility. This paper derives results for an alliance leader (AL)’s optimal risk-sharing ratio and AM’s optimal risk-management effort simultaneously. The derivation is based on solving a restrained optimization problem using the conception and methods from Stackelberg game theory. Results show that an AM’s IA significantly affects risk allocation between AL and AM. Specifically, envious preference is positively related to AL’s optimal risk-sharing ratio, whereas guilty preference negatively affects AL’s optimal risk-sharing ratio. These findings will be of interest to academics and practitioners involved in designing alliance negotiations.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(5)
Research on the Giant and Complex Financial Information System Engineering Management from the Perspective of Meta-synthesis Methodology—with the Bank Card Information Exchange System Engineering as a Sample
Hong-feng Chai,Quan Sun
Front. Eng    2016, 3 (4): 404-413.   https://doi.org/10.15302/J-FEM-2016037
Abstract   HTML   PDF (1478KB)

The paper empirically studies the engineering practices of the national currency circulation information system-China Union Pay’s Bankcard Information Exchange System. By integrating the meta-synthesis methodology and the financial information system engineering, the paper proposes basic principles and processes of the giant and complex financial information system engineering management, and further explores its paradigm and toolkit.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(1)
Development and challenges of planning and scheduling for petroleum and petrochemical production
Fupei LI, Minglei YANG, Wenli DU, Xin DAI
Front. Eng    2020, 7 (3): 373-383.   https://doi.org/10.1007/s42524-020-0123-3
Abstract   HTML   PDF (444KB)

Production planning and scheduling are becoming the core of production management, which support the decision of a petrochemical company. The optimization of production planning and scheduling is attempted by every refinery because it gains additional profit and stabilizes the daily production. The optimization problem considered in industry and academic research is of different levels of realism and complexity, thus increasing the gap. Operation research with mathematical programming is a conventional approach used to address the planning and scheduling problem. Additionally, modeling the processes, objectives, and constraints and developing the optimization algorithms are significant for industry and research. This paper introduces the perspective of production planning and scheduling from the development viewpoint.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(5)
Applying system dynamics to strategic decision making in construction
SangHyun LEE
Front. Eng    2017, 4 (1): 35-40.   https://doi.org/10.15302/J-FEM-2017002
Abstract   HTML   PDF (278KB)

The author discusses the application of System Dynamics to high-level strategic simulation in construction. In particular, System Dynamics’ strength on representing feedback processes, aggregation, soft variables, and continuous simulation clock for high-level simulation are discussed using real modeling examples. From this exercise, it is concluded that System Dynamics offers a great potential for strategic simulation in construction. Further, the author proposes a comprehensive simulation framework that integrates System Dynamics and Discrete Event Simulation for a strategic decision making process in construction where operational details should be taken into account.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(10)
A review of systematic evaluation and improvement in the big data environment
Feng YANG, Manman WANG
Front. Eng    2020, 7 (1): 27-46.   https://doi.org/10.1007/s42524-020-0092-6
Abstract   HTML   PDF (308KB)

The era of big data brings unprecedented opportunities and challenges to management research. As one of the important functions of management decision-making, evaluation has been given more functions and application space. Exploring the applicable evaluation methods in the big data environment has become an important subject of research. The purpose of this paper is to provide an overview and discussion of systematic evaluation and improvement in the big data environment. We first review the evaluation methods based on the main analytic techniques of big data such as data mining, statistical methods, optimization and simulation, and deep learning. Focused on the characteristics of big data (association feature, data loss, data noise, and visualization), the relevant evaluation methods are given. Furthermore, we explore the systematic improvement studies and application fields. Finally, we analyze the new application areas of evaluation methods and give the future directions of evaluation method research in a big data environment from six aspects. We hope our research could provide meaningful insights for subsequent research.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(26)
Economic Growth Model Based on Six Basic Factors of Production—Xu Growth Rate Equation
Shou-bo Xu,Zong-yuan Huang
Front. Eng    2014, 1 (2): 160-175.   https://doi.org/10.15302/J-FEM-2014024
Abstract   PDF (2517KB)

This paper proposes an economic growth model based on the Six Basic Factors of Production and Xu Growth Rate Equation for the first time, which fills-in the deficits of the New Classical Economic Growth Model based on the Solow Model. The empirical analysis indicates that over the past three decades, the consumption of six basic factors of production had complicated relations with economic growth. In some years, the consumption rate of the basic factors of production was meager, but the economy witnessed relatively rocketing growth rate; in some years, the factors of production consumption rate was very high, but the economy growth rate slowed down. In general, economy grows at the expenses of huge consumption of four factors. There is an obvious characteristic of huge input and low efficiency. The average contribution rate of technological advance peaks in the middle, while it drops down at two ends. Noticeably, since 2004, the technology contribution rate generally shows a downward trend, reasons of which should be explored systematically in aspects like economic policy and industry structure with a view to boost further transformation of the macro-economy scientific growth model.

Reference | Related Articles | Metrics
Two-echelon Emergency Response Problem and Simulation Considering Secondary Disasters
Han-peng Zhang, Yi Liao, Hui-xia Luo
Front. Eng    2014, 1 (3): 318-321.   https://doi.org/10.15302/J-FEM-2014042
Abstract   PDF (912KB)

It is necessary for subsequent resource distribution planning that get expected relief time considering secondary disasters after natural disaster. The goal of this research is to develop a two-echelon emergency resource distribution model under condition of secondary disasters. Taking minimal maximize relief time as criterion of relief performance, we developed response strategies and simulation model to get the expected value. Numerical studies of this paper presented the result of response strategies.

Reference | Related Articles | Metrics
Cited: Crossref(5)
Research and practice on system engineering management of a mobile payment project
Yongkai ZHOU, Hongfeng CHAI
Front. Eng    2017, 4 (2): 127-137.   https://doi.org/10.15302/J-FEM-2017011
Abstract   HTML   PDF (761KB)

The popularization of the mobile internet has given rise to demand for flexible and convenient payment methods. For China, it is necessary to keep pace with or even lead the trend of innovation and development in the age of mobile payment. From the perspective of systems engineering, this paper introduces research and implementation of China UnionPay’s mobile payment project. The general requirements and core engineering problems of the mobile payment project are summarized based on analyses of the characteristics and engineering difficulties of this project. Integration of innovative technologies is introduced to resolve the contradiction between ease-of-use and security. A rapid iterative development process is adopted to improve the product release efficiency as well as the users' experience. The launch of the mobile payment project also opens the window to coordinating and upgrading the whole payment industry chains.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(4)
Decomposition analysis applied to energy and emissions: A literature review
Hui WANG, Yafei YANG
Front. Eng    2023, 10 (4): 625-639.   https://doi.org/10.1007/s42524-023-0270-4
Abstract   HTML   PDF (5866KB)

Decomposition analysis has been widely used to assess the determinants of energy and CO2 emissions in academic research and policy studies. Both the methodology and application of decomposition analysis have been largely improved in the past decades. After more than 50 years’ developments, decomposition studies have become increasingly sophisticated and diversified, and tend to converge internally and integrate with other analytical approaches externally. A good understanding of the literature and state of the art is critical to identify knowledge gaps and formulate future research agenda. To this end, this study presents a literature survey for decomposition analysis applied to energy and emission issues, with a focus on the period of 2016–2021. A review for three individual decomposition techniques is first conducted, followed by a synthesis of emerging trends and features for the decomposition analysis literature as a whole. The findings are expected to direct future research in decomposition analysis.

Table and Figures | Reference | Supplementary Material | Related Articles | Metrics
Cited: Crossref(1)
Cyber–Physical Power System (CPPS): A review on measures and optimization methods of system resilience
Gongyu WU, Zhaojun S. LI
Front. Eng    2021, 8 (4): 503-518.   https://doi.org/10.1007/s42524-021-0163-3
Abstract   HTML   PDF (23472KB)

The Cyber–Physical Power System (CPPS) is one of the most critical infrastructure systems in a country because a stable and secure power supply is a key foundation for national and social development. In recent years, resilience has become a major topic in preventing and mitigating the risks caused by large-scale blackouts of CPPSs. Accordingly, the concept and significance of CPPS resilience are at first explained from the engineering perspective in this study. Then, a review of representative quantitative assessment measures of CPPS resilience applied in the existing literature is provided. On the basis of these assessment measures, the optimization methods of CPPS resilience are reviewed from three perspectives, which are mainly focused on the current research, namely, optimizing the recovery sequence of components, identifying and protecting critical nodes, and enhancing the coupling patterns between physical and cyber networks. The recent advances in modeling methods for cascading failures within the CPPS, which is the theoretical foundation for the resilience assessment and optimization research of CPPSs, are also presented. Lastly, the challenges and future research directions for resilience optimizing of CPPSs are discussed.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(13)
The Integration Model of Closed-Loop Supply Chain Resource Allocation Considering Remanufacturing
Xiao-qiu Shi,Yan-yan Li,Wei Long
Front. Eng    2016, 3 (2): 132-135.   https://doi.org/10.15302/J-FEM-2016026
Abstract   HTML   PDF (242KB)

Logistics resource planning is an integration model of materials requirement planning and distribution resource planning which is a resource allocation technology. It is a technology of satisfying both production material supply and resource allocation optimization which is based on inventory management. For the remanufacturing supply chain, recycling and rebuilding of products form a reverse materials movement loop which challenges the traditional logistics resource planning system. For the characteristics of reverse logistics of remanufacturing supply chain, we propose a closed-loop supply chain resource allocation model based on autonomous multi-entity. We focus on integration resource allocation model of materials requirement planning and distribution resource planning considering remanufacturing.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(2)
A review of metro construction in China: Organization, market, cost, safety and schedule
Lieyun DING, Jie XU
Front. Eng    2017, 4 (1): 4-19.   https://doi.org/10.15302/J-FEM-2017015
Abstract   HTML   PDF (942KB)

China is now in an era of large-scale metro construction. This paper reviews the nature of Chinese metro engineering with a specific focus on its organization and market mode, cost structure, safety control and schedule management. Then, an examination on recent research in metro engineering of the National Natural Science Foundation of China (NSFC) is also conducted, which indicates that information and automation based technologies are increasingly used in practice.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(45)
Innovation evolution of China’s high-speed rail industry
Jin CHEN, Liang MEI
Front. Eng    2018, 5 (4): 548-552.   https://doi.org/10.15302/J-FEM-2018208
Abstract   HTML   PDF (534KB)
Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(10)
Quality Function Deployment Implementation in Construction: A Systematic Literature Review
Elizabeth A. Cudney, William L. Gillis
Front. Eng    2016, 3 (3): 224-230.   https://doi.org/10.15302/J-FEM-2016036
Abstract   HTML   PDF (168KB)

The construction of new buildings represents a significant investment. The goal of new building construction is to maximize value and minimize cost while staying on time and within budget. Translating customer requirements into engineering terms for new construction design is vital for a construction project to be successful. Quality function deployment has been successfully used in product development to capture the voice of the customer and translate it into engineering characteristics. Quality function deployment then carries these parameters into production and service to ensure the voice of the customer is being met with the final product. The house of quality, a tool within quality function deployment, can provide a means for comparison of owner’s project requirements and the proposed design, along with identifying how the design decisions impact meeting customer requirements and green building requirements. Quality function deployment can effectively link the project phases through design and construction and into operations and maintenance to ensure the owner’s project requirements are met with the final building. This research identifies and categorizes studies of quality function deployment applications in construction. The research method used is a systematic literature review from databases related to quality function deployment in the construction industry published in the periodicals through 2016. The principal findings of implementations, practices, and integrated approaches are then summarized. This article intends to propel further research of quality function deployment in the construction sector.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(5)
Novel slack-based robust scheduling rule for a semiconductor manufacturing system with uncertain processing time
Juan LIU, Fei QIAO, Yumin MA, Weichang KONG
Front. Eng    2018, 5 (4): 507-514.   https://doi.org/10.15302/J-FEM-2018045
Abstract   HTML   PDF (585KB)

The NP-hard scheduling problems of semiconductor manufacturing systems (SMSs) are further complicated by stochastic uncertainties. Reactive scheduling is a common dynamic scheduling approach where the scheduling scheme is refreshed in response to real-time uncertainties. The scheduling scheme is overly sensitive to the emergence of uncertainties because the optimization of performance (such as minimum make-span) and the system robustness cannot be achieved simultaneously by conventional reactive scheduling methods. To improve the robustness of the scheduling scheme, we propose a novel slack-based robust scheduling rule (SR) based on the analysis of robustness measurement for SMS with uncertain processing time. The decision in the SR is made in real time given the robustness. The proposed SR is verified under different scenarios, and the results are compared with the existing heuristic rules. Simulation results show that the proposed SR can effectively improve the robustness of the scheduling scheme with a slight performance loss.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(2)
Should medium-sized contractors still implement home-made information technologies on construction sites?
Conrad BOTON, Éric ST-PIERRE, Gabriel LEFEBVRE
Front. Eng    2020, 7 (1): 142-158.   https://doi.org/10.1007/s42524-019-0065-9
Abstract   HTML   PDF (3446KB)

Despite the increasing dissemination of the Building Information Modeling (BIM) approach, many firms are still far from BIM and are only starting to adopt information technologies. We conducted an ethnographic action research with an industrial partner that implements information technologies on its construction sites, with a strong preference for home-made applications. Results show that the development of such applications faces difficulties and that multiple iterations and versions are necessary before achieving the expected goals because the required competencies are lacking among internal development teams. Moreover, initial needs evolve considerably throughout the application’s development and evaluation process. However, notwithstanding the difficulties encountered during the different application development phases, the industrial partner believes the decision to be worthwhile because of the desire to have internal control over the project data and the need to consider certain specificities related to business processes.

Table and Figures | Reference | Supplementary Material | Related Articles | Metrics
Cited: Crossref(1)
Cutting CO2 emissions through demand side regulation: Implications from multi-regional input–output linear programming model
Nan LIU, Jidong KANG, Tsan Sheng NG, Bin SU
Front. Eng    2022, 9 (3): 452-461.   https://doi.org/10.1007/s42524-022-0209-1
Abstract   HTML   PDF (1003KB)

This study combines multi-regional input–output (MRIO) model with linear programming (LP) model to explore economic structure adjustment strategies for the reduction of carbon dioxide (CO2) emissions. A particular feature of this study is the identification of the optimal regulation sequence of final products in various regions to reduce CO2 emissions with the minimum loss in gross domestic product (GDP). By using China’s MRIO tables 2017 with 28 regions and 42 economic sectors, results show that reduction in final demand leads to simultaneous reductions in GDP and CO2 emissions. Nevertheless, certain demand side regulation strategy can be adopted to lower CO2 emissions at the smallest loss of economic growth. Several key final products, such as metallurgy, nonmetal, metal, and chemical products, should first be regulated to reduce CO2 emissions at the minimum loss in GDP. Most of these key products concentrate in the coastal developed regions in China. The proposed MRIOLP model considers the inter-relationship among various sectors and regions, and can aid policy makers in designing effective policy for industrial structure adjustment at the regional level to achieve the national environmental and economic targets.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(4)
Detection of schedule delay risk of empirical construction projects
Tsegay GEBREHIWET, Hanbin LUO
Front. Eng    2018, 5 (2): 251-267.   https://doi.org/10.15302/J-FEM-2018086
Abstract   HTML   PDF (741KB)

In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, limited efforts have been made to investigate the typical and the overall schedule delay risk. In this study, our aim is to detect the typical and overall schedule delay risk throughout the construction project lifecycle, which consists of the pre-construction, construction, and post-construction stages, and compare the stages with each other. Common criteria, sub-criteria, and attributes were developed for all alternatives for the purpose of making a risk decision. The methodology that was followed integrated the multiple-criteria decision-making (MCDM) model of fuzzy analytic hierarchy process comprehensive evaluation (FAHPCE) and the relative important index (RII). Data were collected from 77 participants, who were selected through purposive sampling from different contracting organizations in Ethiopian construction projects by means of questionnaires that were distributed to experienced experts. The findings showed that there is a typical delay risk either in the type or in the level of the different construction activities. Consequently, the most influenced alternative is the construction stage because of the high-risk responsibility, resource, and contract condition related criteria. The post-construction stage was the second most influenced stage because of the high-risk responsibility-related criteria. The pre-constructed stage was the least influenced stage that consist high-risk criteria of responsibility, resource, and contract condition related. These differences provided noteworthy information about risk mitigation in construction projects by identifying the exact risk level on specific activity to make appropriate decision.

Table and Figures | Reference | Related Articles | Metrics
Decomposition and decoupling analysis of electricity consumption carbon emissions in China
Yuwen ZHENG, Yifang ZHENG, Guannan HE, Jie SONG
Front. Eng    2022, 9 (3): 486-498.   https://doi.org/10.1007/s42524-022-0215-3
Abstract   HTML   PDF (3014KB)

Electricity consumption is one of the major contributors to greenhouse gas emissions. In this study, we build a power consumption carbon emission measurement model based on the operating margin factor. We use the decomposition and decoupling technology of logarithmic mean Divisia index method to quantify six effects (i.e., emission intensity, power generation structure, consumption electricity intensity, economic scale, population structure, and population scale) and comprehensively reflect the degree of dependence of electricity consumption carbon emissions on China’s economic development and population changes. Moreover, we utilize the decoupling model to analyze the decoupling state between carbon emissions and economic growth and identify corresponding energy efficiency policies. The results of this study provide a new perspective to understand carbon emission reduction potentials in the electricity use of China.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(2)
Management and Practice of Large-Scale Modern Coal Enterprises
An Wang
Front. Eng    2014, 1 (1): 13-17.   https://doi.org/10.15302/J-FEM-2014004
Abstract   HTML   PDF (5064KB)

As the coal-dominated energy structure will remain unchanged in the short term, the sustainable development of the coal industry is still serving as one of the foundations for the sound development of the national economy. The construction of modernized mines based on "four orientations", that is, orientations of scale production, modern technology and equipment, informationized management and professional working team, has been rapidly enhancing its development in the recent decade. However, in the next decade or an even longer period, the industry, with the energy centre shifting to the West of China, will be exposed to new options and development in the layout, structure, model, technology, etc.

Table and Figures | Reference | Related Articles | Metrics
Technology Development and Engineering Practice for Protection and Utilization of Water Resources in Coal Mining in Western China
Da-zhao Gu
Front. Eng    2016, 3 (1): 59-66.   https://doi.org/10.15302/J-FEM-2016010
Abstract   HTML   PDF (2536KB)

Shanxi, Shaanxi, Inner Mongolia, Ningxia, and Gansu (hereafter generally referred as “the Western Area”) are major coal-producing areas in China due to rich coal resources and good mining conditions. However, the Western Area has a serious water shortage. The surface evaporation is huge and a great amount of mine water generated in coal mining is evaporated and lost after discharging to surface. In order to protect and utilize the water resources during large-scale coal mining in the Western Area, Shenhua Group has put forward a technological idea to store mine water in underground mined areas and successfully researched and developed the coal mine underground reservoir technology by solving the technical difficulties of water source prediction, reservoir site selection, reservoir capacity design, dam construction, safety guarantee, water quality control and so on through 20 years of exploration. Now Shenhua Group has successfully established a batch of reservoir in the Shendong Mining Area, obtaining great economic and social benefits. The technology is also extended to other western mining areas, providing an effective path for harmonic mining of coal and water resources in western China.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(10)
Owner-dominated building information modeling and lean construction in a megaproject
Mingyue LI, Zhuoling MA, Xi TANG
Front. Eng    2021, 8 (1): 60-71.   https://doi.org/10.1007/s42524-019-0042-3
Abstract   HTML   PDF (438KB)

The integration of building information modeling (BIM) and lean construction (LC) provides a solution for the management of megaprojects. Previous studies have generally focused on the theoretical or empirical adoption of BIM and LC. Moreover, only a few studies have examined the approach of simultaneously using BIM and LC in megaprojects. Therefore, an intensive study on the application of BIM and LC in megaprojects, particularly to explore considerably effective integrated application modes of BIM and LC in megaprojects, will substantially promote the management efficiency of megaprojects. The current study describes a method that integrates owner-dominated BIM and LC that was developed in a case study. The proposed method provides a framework for all stakeholders to use BIM and LC in a megaproject dominated by the owner. The interactional relations among the owner, BIM, and LC were analyzed and positive interactions were identified. These positive interactions served as a basis for the implementation of this integrated approach in a case study and could be applied to other megaprojects. The megaproject (i.e., airport construction project) was examined to verify the performance of the developed method. Results showed that the integration of BIM and LC dominated by the owner can improve management performance and achieve high quality standard.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(6)
The Building of Papermaking Enterprise’s Recycling Economy Evaluation Index System Based on Value Flow Analysis
Zhi-fang Zhou,Jing Ou,Sha-sha Wang,Xiao-hong Chen
Front. Eng    2016, 3 (1): 9-17.   https://doi.org/10.15302/J-FEM-2016009
Abstract   HTML   PDF (326KB)

At present, the research on circular economy has made a lot of substantive results both at home and abroad. But for the papermaking enterprise, which is the representative of the light industry, few studies have analyzed the evaluation index system of circular economy. Since the current material flow analyses have limitations that the researchers cannot calculate materials with different units. The authors take advantage of the intrinsic correlation between the basic principle of value flow analysis and circular economy, and then analyze the dynamic changes of material flow and value flow through enterprises internal production process. Considering the resource output, the authors set up the layered structure of the evaluation index system, and then preliminarily determine the index form. Next, the authors use the frequency statistics analysis method to adjust indicators, forming a preliminary index system. After that, the principal component analysis and independent analysis are applied for screening. Finally, the authors build a circular economy evaluation index system for papermaking enterprise to provide scientific guidance for the process of circular economy.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(2)
Social responsibility in infrastructure mega-projects: A case study of ecological compensation for Sousa chinensis during the construction of the Hong Kong-Zhuhai-Macao Bridge
Zheming LIU, Liangyan WANG, Zhaohan SHENG, Xinglin GAO
Front. Eng    2018, 5 (1): 98-108.   https://doi.org/10.15302/J-FEM-2018084
Abstract   HTML   PDF (537KB)

Ecological compensation plays an important role in implementing the social responsibility of infrastructure mega-projects. Based on the results of a field study, an in-depth interview, and archive data, this paper introduces the ecological compensation for Sousa chinensis (the Indo-Pacific humpbacked dolphin) during the construction of the Hong Kong-Zhuhai-Macao Bridge. It studies the concrete measures, decision-making processes, and organizational collaboration of the ecological compensation, using the method of a case study. The present study not only enriches our understanding of the ecological compensation practice during the construction of infrastructure mega-projects, but also extends the literature on the social responsibility of infrastructure mega-projects. This sheds light on the protection of the environment as well as biodiversity in the construction of future infrastructure mega-projects.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(8)
Energy storage resources management: Planning, operation, and business model
Kaile ZHOU, Zenghui ZHANG, Lu LIU, Shanlin YANG
Front. Eng    2022, 9 (3): 373-391.   https://doi.org/10.1007/s42524-022-0194-4
Abstract   HTML   PDF (1702KB)

With the acceleration of supply-side renewable energy penetration rate and the increasingly diversified and complex demand-side loads, how to maintain the stable, reliable, and efficient operation of the power system has become a challenging issue requiring investigation. One of the feasible solutions is deploying the energy storage system (ESS) to integrate with the energy system to stabilize it. However, considering the costs and the input/output characteristics of ESS, both the initial configuration process and the actual operation process require efficient management. This study presents a comprehensive review of managing ESS from the perspectives of planning, operation, and business model. First of all, in terms of planning and configuration, it is investigated from capacity planning, location planning, as well as capacity and location combined planning. This process is generally the first step in deploying ESS. Then, it explores operation management of ESS from the perspectives of state assessment and operation optimization. The so-called state assessment refers to the assessment of three aspects: The state of charge (SOC), the state of health (SOH), and the remaining useful life (RUL). The operation optimization includes ESS operation strategy optimization and joint operation optimization. Finally, it discusses the business models of ESS. Traditional business models involve ancillary services and load transfer, while emerging business models include electric vehicle (EV) as energy storage and shared energy storage.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(4)
Smart construction site in mega construction projects: A case study on island tunneling project of Hong Kong-Zhuhai-Macao Bridge
Hongtao ZHOU, Hongwei WANG, Wei ZENG
Front. Eng    2018, 5 (1): 78-87.   https://doi.org/10.15302/J-FEM-2018075
Abstract   HTML   PDF (408KB)

The construction sites of mega construction projects (MCP) often have numerous participants with interfacing work within a highly complex system. It is critical how to realize collaborative work and information sharing among such participants. The information and communication technologies (ICTs) provides a technical guarantee for solving this problem. Existing research has been achieved the partial processes digitization of construction site, but certain problems still exist: 1)information perception of the construction site is passive. 2) common collaboration and coordination problems in the construction industry have not been addressed. The emerging trends of ICTs have resulted in the integration of various computer technologies such as CPS, BIM, big data, and cloud computing into construction process, which would changes behavioral and management mode of construction sites. These new ICTs have been applied successfully in MCP, in particular, Hong Kong-Zhuhai-Macao Bridge project. A new management mode of construction sites is inspired by these case. In this paper, a new management mode of construction site for MCP has been proposed, namely, smart construction site. The ultimate goal of smart construction site is to accomplish safe, efficient and high-quality construction. This study put forward the conceptual framework for smart construction site, and have identified three key elements of smart construction site, including information support platform, collaboration work, and intelligent construction management. A case study on Hong Kong-Zhuhai-Macao Bridge project work as an evidence to support the practicability of the proposed mode. Significant contributions of this study is to propose a new management mode for MCP in construction industry, which would enrich the body of knowledge or the construction management community. Future research should be dedicated to further explore the potential of smart construction site in MCP management.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(16)
System dynamics analytical modeling approach for construction project management research: A critical review and future directions
Xiaoxiao XU, Patrick X. W. ZOU
Front. Eng    2021, 8 (1): 17-31.   https://doi.org/10.1007/s42524-019-0091-7
Abstract   HTML   PDF (587KB)

Building and infrastructure construction projects can be viewed as a complex system consisting of many subsystems. Over the last two decades, considerable researches that use system dynamics (SD) as an analytical and modeling approach exist to address construction project management issues. However, only few critical reviews have been conducted to provide an in-depth understanding of SD application in construction project management. Moreover, many studies have failed to apply SD accurately. Therefore, the present study aims to gain an understanding of the current state of play and future directions in applying SD method in construction project management research, by undertaking a comprehensive review of 105 relevant articles published from 1994 to 2018. These articles are analyzed in terms of annual publication rate, key papers and their contribution, critical issues in SD application, and research topics. A significant increase in the number of publications in the last five years has been observed. When applying SD method to model construction system, the following aspects must be carefully considered: Model boundary, model development, model test, and model simulation. In addition, SD has been applied in a wide range of research topics, including (1) sustainable construction; (2) design error, rework, and change management; (3) risk management; (4) resource management; (5) decision making; (6) hybrid modeling; (7) safety management; (8) PPP project; and (9) organization performance. Based on the review findings, this study discusses three future research directions, namely, integration of SD with other methods, uncertainty analysis, and human factor analysis. This study can help researchers gain an in-depth understanding of the critical issues in the application of SD in construction management and the state-of-the-art of SD research.

Table and Figures | Reference | Related Articles | Metrics
Cited: Crossref(15)